title: "In-service X70 Type B sleeve installation on West-East Gas Pipeline Line 3, China"
description: "In-service installation of Grade X70 Type B steel sleeves on West-East Gas Pipeline Line 3 to match carrier-pipe strength and cut shell weight."
section: case-studies
updated: 2026-11-25
canonical: https://pipelinerepairs.com/case-studies/cs-07-in-service-x70-type-b-sleeve-installation-on-west-east-gas-pipeline-line/
markdown: https://pipelinerepairs.com/articles/case-studies/cs-07-in-service-x70-type-b-sleeve-installation-on-west-east-gas-pipeline-line.md
---

# In-service X70 Type B sleeve installation on West-East Gas Pipeline Line 3, China

In short. In-service installation of Grade X70 Type B steel sleeves on West-East Gas Pipeline Line 3 to match carrier-pipe strength and cut shell weight.

Source: Hebei Haihao Group (reporting a field job by the National Pipeline Network West Division / Jiuquan Oil and Gas Transmission Branch) (2023). Account type: Vendor account.

In 2023, the Jiuquan branch of China's National Pipeline Network West Division installed X70 Type B sleeves on West-East Gas Pipeline Line 3 at kilometre post 1984+150 m, while the line stayed in service. A sleeve supplier reported that the X70 shells were 19 to 30 percent thinner and about 200 kg lighter than the Q345RB sleeves then typically used, and argued that matching the pipe grade reduces stress concentration. The article does not describe the underlying defect in any detail, so it is useful mainly as a public example of in-service Type B sleeve welding on a high-pressure gas trunkline, not as a full engineering case history.

## Method

Type B steel sleeve, installed with in-service (hot) welding, using X70 sleeve material instead of the heavier Q345RB sleeves then common in that network

## Defect

Described only as a defect repair associated with corrosion and wall-loss risk; the specific anomaly at KP1984+150 m is not detailed

## Pipe

West-East Gas Pipeline Line 3 at KP1984+150 m. Carrier-pipe size and pressure are not stated. The vendor says the X70 sleeves were 19 to 30 percent thinner than the previous sleeve design and about 200 kg lighter.

## Outcome

The branch reported that the hot work and sleeve installation were completed. The write-up is a fitting manufacturer's account of a state-network job, not an independent investigation.

Schedule, cost, and service-life figures in this note are the publisher’s claims. They were not checked against an operator record or a laboratory report.

Dates: Article dated 25 September 2023. Exact installation date not stated.

Maker named in the source: X70 Type B sleeves (manufacturer of the installed sleeves not independently confirmed; reported by Haihao).

## Sources

- [In-service X70 Type B sleeve installation on West-East Gas Pipeline Line 3, China](https://haihaogroup.com/successful-application-of-x70-type-b-sleeves-in-the-national-pipeline-west-division-company.html) — Hebei Haihao Group (reporting a field job by the National Pipeline Network West Division / Jiuquan Oil and Gas Transmission Branch)