title: "Underwater composite sleeve repair of girth-weld corrosion on a 12-inch gas pipeline"
description: "Submerged in-service composite sleeve repair bridging 74 percent girth-weld corrosion on a 12-inch gas pipeline at 68 bar."
section: case-studies
updated: 2026-11-25
canonical: https://pipelinerepairs.com/case-studies/cs-14-underwater-composite-sleeve-repair-of-girth-weld-corrosion-on-a-12-inch-gas-/
markdown: https://pipelinerepairs.com/articles/case-studies/cs-14-underwater-composite-sleeve-repair-of-girth-weld-corrosion-on-a-12-inch-gas-.md
---

# Underwater composite sleeve repair of girth-weld corrosion on a 12-inch gas pipeline

In short. Submerged in-service composite sleeve repair bridging 74 percent girth-weld corrosion on a 12-inch gas pipeline at 68 bar.

Source: CSNRI / Critica Infrastructure (Clock Spring). Account type: Vendor account.

Inspection found corrosion of up to 74 percent wall loss next to a girth weld on a 12-inch gas line operating at 68 bar, and the work had to be done underwater with the line still in service. CSNRI says the system’s adhesive and filler can cure fully submerged, unlike some other composite systems that need a dry bond surface. Trained installers placed units on both sides of the weld as a bridge, eight sleeves in all, and the vendor reports the repair was finished in about three hours. Independent confirmation is not provided.

## Method

Eight Clock Spring composite sleeves placed as a bridge on each side of a circumferential girth weld, with adhesive and filler that the vendor says cure underwater

## Defect

External corrosion adjacent to a girth weld, up to 74 percent metal loss

## Pipe

12-inch (305 mm) high-pressure gas pipeline, 9.52 mm (0.37 inch) wall, 68 bar (980 psi) operating pressure, 22 C. Location was underwater. Grade not stated.

## Outcome

CSNRI reports the eight sleeves were installed in about three hours with no welding and no interruption of operations.

Schedule, cost, and service-life figures in this note are the publisher’s claims. They were not checked against an operator record or a laboratory report.

Dates: Year not stated.

Maker named in the source: CSNRI (Clock Spring).

## Sources

- [Clock Spring underwater repair of girth-weld corrosion on a 12-inch gas pipeline](https://www.cs-nri.com/case_study/clock-spring-repairs-damaged-girth-weld/) — CSNRI / Critica Infrastructure (Clock Spring)