---
title: "Composite repair of a 32-inch offshore riser, Thailand"
description: "Composite and subsea-epoxy reinforcement of severe wall loss on a 32-inch offshore gas riser in Thailand, avoiding a prolonged shutdown."
section: case-studies
updated: 2026-11-25
canonical: https://pipelinerepairs.com/case-studies/cs-19-composite-repair-of-a-32-inch-offshore-riser-thailand/
markdown: https://pipelinerepairs.com/articles/case-studies/cs-19-composite-repair-of-a-32-inch-offshore-riser-thailand.md
---

# Composite repair of a 32-inch offshore riser, Thailand

In short. Composite and subsea-epoxy reinforcement of severe wall loss on a 32-inch offshore gas riser in Thailand, avoiding a prolonged shutdown.

Source: Offshore magazine (1 October 2010), article by Matt Green, Neptune Research Inc. (2010). Account type: Trade press.

An offshore operator in Thailand faced severe wall loss on a 32-inch riser that fed power-plant fuel supply. A cut-out would have required a long shutdown. The pipe was blasted, pits were filled with epoxy putty, a Kevlar-reinforced subsea epoxy was applied, and about 10 feet of subsea composite wrap was installed. The manufacturer reported the work took less than 36 hours, a four-hour test at 1,700 psi was successful, and the riser went back to its 1,580 psi design pressure and the field's 630 MMcf/d rate the same afternoon. The article also notes Petrobras diver applications of the same system to 100 metres, but those jobs are described only in general terms.

## Method

NRI Syntho-Glass XT water-activated fiberglass composite wrap over high-compression epoxy putty and Syntho-SubSea LV epoxy, applied over about 10 feet (3 m)

## Defect

Severe wall loss on an offshore riser, to the point that the alternative was a full cut-out and replacement

## Pipe

32-inch riser on an offshore oil facility in Thailand supplying fuel to power plants. Restored to the original design pressure of 1,580 psi (109 bar). A four-hour pressure test was run at 1,700 psi (117 bar). The field is described as producing 630 MMcf/d.

## Outcome

The author reports the repair was completed in less than 36 hours, passed the 1,700 psi test, and the pipe returned to full operation the same afternoon, avoiding a shutdown the operator had valued at about $125,000 per hour. Those time and cost figures are from the product manufacturer.

This account is taken from a public regulatory or investigative record.

Dates: Article dated 1 October 2010; the repair was at or shortly before that date.

Maker named in the source: Neptune Research Inc. (NRI), later part of CSNRI.

## Sources

- [Syntho-Glass XT repair of a 32-inch offshore riser, Thailand](https://www.offshore-mag.com/equipment-engineering/article/16763731/composites-offer-effective-offshore-pipe-repair-alternative) — Offshore magazine (1 October 2010), article by Matt Green, Neptune Research Inc.
