title: "Splash-zone composite repair of mechanical damage on a 12-inch subsea crude line, Gulf of Mexico"
description: "Diver-applied underwater carbon-fiber wrap with splashzone resin repairing two meters of mechanical damage on a 12-inch Gulf crude line."
section: case-studies
updated: 2026-11-25
canonical: https://pipelinerepairs.com/case-studies/cs-20-splash-zone-composite-repair-of-mechanical-damage-on-a-12-inch-subsea-cr/
markdown: https://pipelinerepairs.com/articles/case-studies/cs-20-splash-zone-composite-repair-of-mechanical-damage-on-a-12-inch-subsea-cr.md
---

# Splash-zone composite repair of mechanical damage on a 12-inch subsea crude line, Gulf of Mexico

In short. Diver-applied underwater carbon-fiber wrap with splashzone resin repairing two meters of mechanical damage on a 12-inch Gulf crude line.

Source: IAS Group / IC Integrity (Technowrap). Account type: Vendor account.

A 12-inch crude line in the Gulf of Mexico had external mechanical damage on a two-metre stretch, 12 feet below the surface. An engineered layer count was prepared for a 20-year design life at 75.8 bar. Divers bristle-blasted the pipe to St 3 and applied a carbon-fibre composite with a splash-zone resin, which is formulated to cure underwater. The contractor says the line was not shut down and no hot work was used. The page also points to a PRCI research program on subsea composite repairs, which is useful context, but the field job itself is a vendor summary.

## Method

Technowrap Structural Rehabilitation System (carbon fibre) with Technowrap Splashzone resin, applied by divers after bristle-blasting to St 3. The page also notes a 15-month PRCI-led research program on subsea composite repairs.

## Defect

External mechanical damage on a 2-metre section

## Pipe

12-inch (323.8 mm) crude-oil pipeline, 12 feet below sea level in the Gulf of Mexico. Design pressure 75.8 bar, design temperature 38 C, application temperature 10 C, 20-year design life. Wrap length is listed as 5,000 mm in the project table.

## Outcome

The vendor reports no hot work and no shutdown, with flow maintained. No independent test results are given on this page.

Schedule, cost, and service-life figures in this note are the publisher’s claims. They were not checked against an operator record or a laboratory report.

Dates: Year not stated.

Maker named in the source: Technowrap (IC Integrity / IAS Group).

## Sources

- [Technowrap Splashzone repair of mechanical damage on a 12-inch subsea crude line, Gulf of Mexico](https://www.ias-group.com.au/view/case-study-articles/technowrap-splashzone-subsea-12-crude-oil-line) — IAS Group / IC Integrity (Technowrap)