title: "Epoxy-filled sleeve encapsulation of a large dent on a 14-inch trunkline, Papua New Guinea"
description: "Custom enlarged-body epoxy-filled steel sleeve encapsulating a large landslide dent on a 14-inch trunkline in Papua New Guinea."
section: case-studies
updated: 2026-11-25
canonical: https://pipelinerepairs.com/case-studies/cs-22-epoxy-filled-sleeve-encapsulation-of-a-large-dent-on-a-14-inch-t/
markdown: https://pipelinerepairs.com/articles/case-studies/cs-22-epoxy-filled-sleeve-encapsulation-of-a-large-dent-on-a-14-inch-t.md
---

# Epoxy-filled sleeve encapsulation of a large dent on a 14-inch trunkline, Papua New Guinea

In short. Custom enlarged-body epoxy-filled steel sleeve encapsulating a large landslide dent on a 14-inch trunkline in Papua New Guinea.

Source: PipeServ (RAMFILL). Account type: Vendor account.

A falling tree dented a highly productive 14-inch trunkline in Papua New Guinea and ovalized a wide stretch of pipe. A pre-cured composite sleeve had already been put on as an emergency repair. Because a cut-out would have stopped production, the operator, which had used epoxy-filled sleeves before, ordered a custom 3-metre epoxy-filled steel sleeve with an enlarged DN500 body to clear the dent. After the sleeve was welded and inspected, the annulus was filled with 100 percent-solids epoxy for load transfer, corrosion protection, and leak sealing. The supplier says the line stayed in service. This is one of the few public, detailed epoxy-filled-shell field jobs.

## Method

Custom RAMFILL-B+RE epoxy-filled steel sleeve, 3.0 m long with an enlarged DN500 body, welded then filled with 100 percent-solids liquid epoxy. A Clock Spring wrap had been applied earlier as an emergency repair.

## Defect

Large dent caused by a falling tree, with ovality over a wide area

## Pipe

DN350 / 14-inch trunkline, Papua New Guinea. Design pressure and grade are described only as meeting the client's specified design pressures and temperatures. The line could not be shut down.

## Outcome

PipeServ reports the sleeve was welded, NDT-inspected, and epoxy-filled with the line remaining in service, and describes the repair as permanent with no production loss. Those claims are the supplier's.

Schedule, cost, and service-life figures in this note are the publisher’s claims. They were not checked against an operator record or a laboratory report.

Dates: Year of the repair is not stated. The PDF path is dated January 2025.

Maker named in the source: PipeServ (RAMFILL); prior emergency wrap by Clock Spring / CSNRI.