# How an enforcement note on this site is written

In short. The form for later public orders and incident records. Invented repair walk-throughs stay in the example case studies.

Later entries in this section should be real public documents, written the way the [Sterling Heights order](/enforcement/sterling-heights-2026/) is written. The example case studies elsewhere on the site are invented on purpose. Do not put an illustration in this section, and do not put a real order in the example section.

PHMSA’s enforcement portal is [primis.phmsa.dot.gov/enforcement-data](https://primis.phmsa.dot.gov/enforcement-data/). The older address [primis.phmsa.dot.gov/comm/reports/enforce/](https://primis.phmsa.dot.gov/comm/reports/enforce/) redirects there. A note should link the case page and the PDF or order text, not a retelling that cannot be checked.

## What a later note needs

1. **The document.** Case number, date, who issued it, and the statute or regulation it cites. A corrective action order, a safety order, a consent order, and a notice of probable violation are different instruments. Name the one in hand.
2. **What is established and what is not.** Preliminary findings stay labeled as preliminary. A root cause that the order says is still underway is not written as the cause.
3. **The pipe and the place.** Diameter, seam type, product, and location only as the document states them. High consequence areas and release volumes are quoted from the document, with the document’s own qualifiers (“at least,” “estimated”).
4. **The repair fact that matters here.** Sleeve type, what failed, and which records were or were not produced. Link the method note — [Type A](/repair-methods/type-a-sleeves/), [Type B](/repair-methods/type-b-sleeves/), [compression sleeves](/repair-methods/compression-sleeves/) — instead of redefining the hardware.
5. **The required actions.** Shutdowns, pressure restrictions, tests, inventories, and deadlines, using the order’s own definitions when “affected” and “isolated” mean different lengths of pipe.
6. **What the note will not do.** No company ranking, no claim that a method is disqualified because it appears in one order, and no personal contact list copied out of a service letter.

National Transportation Safety Board reports stay with [Lessons from public investigations](/regulations/lessons-from-investigations/). Those are probable-cause reports. An order under 49 U.S.C. 60112 is a hazard determination and a set of required actions. Both can be true of the same failure, and they are not the same paragraph.

## Sources

- [PHMSA enforcement data](https://primis.phmsa.dot.gov/enforcement-data/) — PHMSA
- [Earlier enforcement reports path, which redirects to the portal above](https://primis.phmsa.dot.gov/comm/reports/enforce/) — PHMSA
- [49 CFR 190.5, service of orders](https://www.ecfr.gov/current/title-49/section-190.5) — eCFR