---
title: "Evaluating a repair product or pitch"
description: "A neutral checklist of questions to ask any repair vendor, and the common sales techniques worth recognizing, so buyers and engineers can compare products on evidence."
section: learn
updated: 2026-11-26
canonical: https://pipelinerepairs.com/learn/evaluating-a-repair-product-or-pitch/
markdown: https://pipelinerepairs.com/articles/learn/evaluating-a-repair-product-or-pitch.md
---

# Evaluating a repair product or pitch

In short. A neutral checklist of questions to ask any repair vendor, and the common sales techniques worth recognizing, so buyers and engineers can compare products on evidence.

Anyone buying or specifying a repair, whether an integrity engineer, a project manager or a procurement team, will hear pitches. Most are honest. Even honest ones are written to show the product at its best, so the buyer's job is to ask for the information that makes products comparable. This page lists the questions worth asking every vendor and describes some common sales techniques in general terms. It applies to every kind of repair product and every supplier.

## Questions to ask any vendor

### Test data

- Who ran the tests? Were they done by an independent laboratory, or by the supplier? Was the work witnessed or reviewed by a third party?
- What was tested: pipe diameter, grade, wall thickness, defect type and size, pressure range, number of cycles, temperature, and how the repair was installed? Do those match your pipe, your defect, and your operating conditions?
- Is the full report available, or only a summary? Does it include failures, not just passes?
- Was the test a burst test, a fatigue test, or both? Both answer different questions. See the [test reports](/test-reports/) section for how published programs are described.

### Standards and codes

- Which standard does the product claim to meet, which part or clause, and which edition? Is that edition the one your regulator has adopted? See [how codes and regulations differ](/codes/how-codes-and-regulations-differ/) and [49 CFR 192.7](https://www.ecfr.gov/current/title-49/section-192.7).
- Is the claim based on a qualification test, a design calculation, or both? For composites, see [ASME PCC-2](/codes/asme-pcc-2/), [ISO 24817](/codes/iso-24817/) and [composite repair qualification](/codes/composite-repair-qualification/).
- Has any regulator issued guidance or an advisory about this type of repair? See [advisory bulletins](/regulations/advisory-bulletins/).

### Installation

- What training or qualification does the installer need? Who issues it, and how is it checked? Does your own organization's operator qualification program cover the task?
- How many steps, how much specialized equipment, and how many things have to go right on site? Is there a field-measurable check that the installation was done correctly?
- What are the ambient and pipe-surface limits on temperature, humidity and surface preparation? See [surface preparation](/coatings/surface-preparation/).
- Can it be installed on the live line, and at what pressure? What are the consequences if a step is missed?

### Limits

- What pressure and temperature limits apply, and for how long? What defect types is the product not for (leaks, cracks, dents, welds, seams)?
- What does the vendor say about interaction with cathodic protection and coating? See [coating at repair sites](/coatings/coating-at-repair-sites/).
- Is the repair intended to be temporary or permanent, and who makes that determination? See [temporary and permanent repairs](/regulations/temporary-and-permanent-repairs/).

### After the repair

- How is the repair inspected after installation, and later in service? Can ILI or direct examination see through or past it?
- What records does the vendor supply: materials certificates, batch numbers, installer identification, cure or heat records, and photographs? See [repair records](/regulations/repair-records/).
- What is the warranty, and what does it exclude?

### Track record and cost

- How many installations are in service, for how long, on what kind of pipe, and can you speak to operators who have used them? Were any removed, and why?
- What is the total installed cost? That includes excavation, surface preparation, installation labor, specialized crew or equipment, inspection, coating restoration, and lost production. Material price alone is rarely the number that matters.
- What happens to the schedule if the pipe condition differs from what was expected?

## Common sales techniques

None of these is dishonest in itself. Each one becomes a problem when it is used in place of the evidence above.

- **Laboratory numbers without field context.** A strong result from a clean specimen on a bench says little about a corroded, out-of-round pipe at the bottom of a wet ditch. Ask how the test conditions map to the field.
- **"Meets code" with no clause.** A claim that a product meets code or is compliant is not specific until it names the document, the edition, the clause and who judged compliance. Ask for the clause.
- **Comparison to the worst alternative.** Showing a product beside an old, poorly made or unsuitable alternative proves little. Ask for a comparison against the options you would really consider.
- **Urgency.** A deadline on pricing, a claim that competitors are about to adopt it, or pressure to decide before the next outage. Urgent decisions deserve at least the same questions.
- **Selective testimonials.** A single satisfied customer is an anecdote. Ask for the full installed base, including failures.
- **Large single numbers.** A headline burst pressure or a very high cycle count can be true and still describe a very different pipe and defect from yours.
- **Authority by association.** Mentions of a regulator, a standards body or a research organization do not mean those bodies endorsed the product. Regulators generally do not approve products. Check the actual document.
- **Cost framed as material price.** A cheaper kit that needs more crew time, more equipment or a longer outage can cost more in total.
- **Complexity hidden in the fine print.** Installation limits, environmental limits and training requirements often sit in an installation manual, not in the brochure. Ask for the manual before you decide.

## Use the answers

Write the answers in a table so each product is evaluated against the same facts. If an answer is missing, treat it as unknown, not as a yes. For the technical side of the decision, see [how a repair gets chosen](/learn/how-a-repair-is-chosen/) and the method pages, such as [compression sleeve questions](/repair-methods/compression-sleeve-questions/), which applies the same approach to one method.

— The Pipeline Repairs team

## Sources

- [49 CFR 192.713 — Permanent field repair of imperfections and damages](https://www.ecfr.gov/current/title-49/section-192.713) — eCFR
- [49 CFR 192.7 — Incorporation by reference](https://www.ecfr.gov/current/title-49/section-192.7) — eCFR
- [Composite repair guideline (BSEE/PHMSA report PDF)](https://www.bsee.gov/sites/bsee.gov/files/2023-05/763af.V1.pdf) — BSEE and PHMSA
- [ADB-2026-02 — Integrity risks of Type A repair sleeves](https://www.federalregister.gov/documents/2026/01/28/2026-01675/pipeline-safety-advisory-bulletin-on-the-integrity-risks-of-type-a-repair-sleeves) — Federal Register
- [Temporary repair and permanent repair FAQs](https://www.phmsa.dot.gov/regulatory-compliance/phmsa-guidance/phmsa-pipeline-safety-temporary-repair-and-permanent-repair-frequently-asked-questions) — PHMSA
