# Interpretations and FAQs

In short. How to use PHMSA interpretation letters and the temporary-versus-permanent repair FAQs without treating them as amendments.

A written interpretation is a letter. The path is 49 CFR 190.11(b), which PHMSA restates on its interpretations page: write the Office of Pipeline Safety, include a return address, and expect the request to need on the order of 120 days. Incoming requests are posted for comment before the letter is issued. The pending-interpretations page is that docket. A letter answers the facts in the request. Quoting it for a different pipe, a different defect, or a different edition of the operator’s procedure is a new question.

Two published letters are useful because they state limits that repair programs keep testing.

[PI-17-0014](https://www.phmsa.dot.gov/regulations/title49/interp/pi-17-0014-0) (26 April 2018) addressed §195.452(h)(4)(iii) and corrosion of or along a longitudinal seam weld. The requester asked, in substance, whether the 180-day schedule depended on the kind of corrosion. The 2018 letter said the paragraph does not draw that distinction, and that the schedule applies to that corrosion generally. PHMSA withdrew the letter on 12 September 2025 and issued [FAQ 7.16](https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/2025-09/Liquid%20IM%20FAQs%209-12-25%20revision.pdf) in the hazardous-liquid integrity-management FAQs, dated the same day, to address the issue. The FAQ says the 180-day criterion in §195.452(h)(4)(iii)(H) is for corrosion “of or along” a longitudinal seam, meaning corrosive attack that specifically affects the seam. Isolated pits near a seam are not automatically in that bucket. If corrosion near a seam is not repaired under this criterion, the operator has to be able to demonstrate that it does not affect the seam more than the pipe body, considering the type of anomaly, the age of the pipe, and the type of seam.

[PI-24-0003](https://www.phmsa.dot.gov/regulations/title49/interp/pi-24-0003) (2 July 2024) addresses a liquid operator that inherited a repair plan. The prior operator had classified linear anomalies as 180-day conditions more conservatively than the rule required. Later inspection convinced the new operator that many of those features were not actionable. PHMSA agreed that a condition which does not meet the regulatory threshold does not, by the regulation alone, inherit a 180-day clock. It then held the operator to the plan: §195.452 is a minimum, and where the integrity program treats a more conservative population as a 180-day condition, the program is what the operator must follow. The letter is about one pipeline’s plan. The principle is portable. You do not get to keep the credit for a conservative procedure and discard the schedule that came with it.

## The repair FAQs

PHMSA’s temporary-and-permanent repair FAQs are aimed at a specific bad habit: a repair installed as temporary, then left until everybody calls it permanent. The FAQ page states that goal. The underlying duties are the ones already in Parts 192 and 195 — repairs made in a safe manner, permanent leak repairs made by a listed or demonstrated method, integrity conditions remediated on the schedule. A clamp or a sleeve with a note that says “temporary, replace at the next outage” is a commitment. The FAQs are guidance about that commitment, not a new maximum life that applies to every fitting.

Other FAQ sets live on the [PHMSA FAQ index](https://www.phmsa.dot.gov/about-phmsa/phmsa-faqs). They are worth searching before inventing an answer, and they carry the same limit the guidance portal states. They are not the code.

## Sources

- [How to request an interpretation](https://www.phmsa.dot.gov/regulations/title49/b/2/1) — PHMSA
- [Pending interpretations](https://www.phmsa.dot.gov/standards-rulemaking/pipeline/interpretations/pending-pipeline-interpretations) — PHMSA
- [PI-17-0014 — withdrawal of the 2018 seam-corrosion letter](https://www.phmsa.dot.gov/regulations/title49/interp/pi-17-0014-0) — PHMSA
- [Hazardous liquid integrity management FAQs, 12 September 2025 revision (FAQ 7.16)](https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/2025-09/Liquid%20IM%20FAQs%209-12-25%20revision.pdf) — PHMSA
- [PI-24-0003 — a plan stricter than the rule](https://www.phmsa.dot.gov/regulations/title49/interp/pi-24-0003) — PHMSA
- [Temporary and permanent repair FAQs](https://www.phmsa.dot.gov/regulatory-compliance/phmsa-guidance/phmsa-pipeline-safety-temporary-repair-and-permanent-repair-frequently-asked-questions) — PHMSA
- [PHMSA FAQ index](https://www.phmsa.dot.gov/about-phmsa/phmsa-faqs) — PHMSA
- [PHMSA guidance portal](https://www.phmsa.dot.gov/guidance) — PHMSA