title: "Official repair guidance"
description: "Official repair guidance by country: U.S. PHMSA documents (ADB-2026-02 on Type A sleeves, the July 2026 repair-criteria proposal, older notices), Canadian regulators and standards, and UK HSE guidance, linked to the official source."
section: regulations
updated: 2026-11-25
canonical: https://pipelinerepairs.com/regulations/official-guidance/
markdown: https://pipelinerepairs.com/articles/regulations/official-guidance.md
---

# Official repair guidance

In short. Official repair guidance by country: U.S. PHMSA documents (ADB-2026-02 on Type A sleeves, the July 2026 repair-criteria proposal, older notices), Canadian regulators and standards, and UK HSE guidance, linked to the official source.

This page is organized by country: [United States](#united-states), [Canada](#canada), and [International and other](#international-and-other). PHMSA Advisory Bulletin ADB-2026-02 is the 2026 U.S. sleeve document. A separate notice, 91 FR 42272, is a proposed repair-criteria rule and is not yet in force. Local copies of U.S. government PDFs are linked below. The Federal Register text is the citation.

## United States

### ADB-2026-02 — Type A repair sleeves

Published 28 January 2026 at 91 FR 3780 (issued 26 January 2026). Docket PHMSA-2026-0298. FR Doc. 2026-01675.

The bulletin does not ban Type A sleeves, the reinforcing shells whose ends are not welded to the carrier. It tells hazardous-liquid operators that poorly installed or poorly managed Type A sleeves have leaked, including sleeves put on dents years earlier. The releases it cites are the 2014 gasoline leak at Belton, South Carolina, under a 1991 Type A sleeve on a dent; the 14 August 2020 Colonial Line 1 gasoline leak at Huntersville, North Carolina, under a 2004 Type A sleeve on a dent, with corrosion fatigue; and the 31 January 2025 Twin Oaks jet-fuel leak at Upper Makefield Township, Pennsylvania, under a 1995 Type A sleeve on a bottom-side dent, with near-neutral stress-corrosion cracking after water entered the annulus.

PHMSA contrasts a Type A sleeve, which can reinforce many non-leaking defects when it is installed and managed, with a Type B sleeve, whose ends are welded to the carrier so it can also hold pressure. The advice is to keep installation records (as-found and as-left defect, sleeve type, welding and nondestructive testing, coating and annular filler, photographs), to use in-line inspection to find Type A sleeves, to say whether each sleeve is temporary or permanent, to put the dent, the repair, pressure cycling, and moisture into the risk model, to run a fatigue evaluation for sleeves that see frequent cycles, and to tighten leak detection because a small leak under a sleeve can be missed. Like other advisory bulletins, it is guidance, not a new rule.

Official text: [91 FR 3780](https://www.federalregister.gov/documents/2026/01/28/2026-01675/pipeline-safety-advisory-bulletin-on-the-integrity-risks-of-type-a-repair-sleeves). Local copy: [ADB-2026-02 PDF](/downloads/guidance/2026-01-28-adb-2026-02-type-a-repair-sleeves-91-fr-3780.pdf). The engineering note is [Type A sleeves](/repair-methods/type-a-sleeves/).

### July 2026 repair-criteria proposal — still a proposal

On 8 July 2026 PHMSA published a notice of proposed rulemaking at 91 FR 42272 (Docket PHMSA-2025-0019, RIN 2137-AF44, FR Doc. 2026-13805). Comments were due 8 September 2026. It proposes to align anomaly-response and repair criteria for gas transmission and hazardous-liquid lines, including how discovery is timed from a preliminary versus a final in-line inspection report. It is not a final rule, and it is not the Type A sleeve bulletin.

Official text: [91 FR 42272](https://www.federalregister.gov/documents/2026/07/08/2026-13805/pipeline-safety-repair-criteria-for-hazardous-liquid-and-gas-transmission-pipelines). Local copy: [NPRM PDF](/downloads/guidance/2026-07-08-nprm-repair-criteria-91-fr-42272.pdf).

### The rest of the public list

Documents below are in the order they were issued. A local path is a U.S. government PDF. None of these notices amends Part 192 or Part 195 by itself.

#### Fact Sheet: Pipeline Repairs

PHMSA's plain-language overview of how operators find a defect, dig it up, and choose a repair. It lists cut-out and replace, grinding, weld-metal deposition, full-encirclement sleeves, and mechanical bolt-on clamps. It describes a Type A sleeve as a reinforcing full encirclement whose halves are welded together but whose ends are not welded to the pipe, and only for defects that do not go through the wall; a Type B sleeve as fully welded to the pipe and able to contain a leak; and composite fiber wraps as an alternative to a Type A sleeve for remediating defects. It also notes that if a repair cannot restore the original design specification, the operator must lower the maximum operating pressure.

Topics: Repair methods; Type A and Type B sleeves; composite wraps; clamps; grinding; weld deposition; cut-out.

[Official page](https://primis.phmsa.dot.gov/stakeholder-comms/factsheets/FSPipelineRepairs/)

#### O&M Enforcement Guidance, Part 192 (Subparts L and M)

Internal enforcement manual that tells inspectors how PHMSA reads the gas operations-and-maintenance repair rules. On testing of repairs (§ 192.719), it says replacement segments must be pressure-tested, NDT is required for welded repairs under §§ 192.713, 192.715, and 192.717, and records must be traceable to the pipe and the welds. It is inspector guidance, not a new obligation on operators, but it is the document PHMSA points to when asked how it applies those sections.

Topics: 192.711–192.719; testing of repairs; welding inspection; replacement pipe.

[Official page](https://www.phmsa.dot.gov/sites/phmsa.dot.gov/files/docs/regulatory-compliance/pipeline/enforcement/5776/o-m-enforcement-guidance-part-192-7-21-2017.pdf)

#### 15 January 1971 — Interpretation PI-71-007 (gas distribution repair)

Early letter answering whether an operator may use a welded full-encirclement split sleeve on a defective weld in order to skip X-ray when an X-ray truck is far away. OPS said a sleeve under § 192.715(c) is allowed only when a repair cannot be made under (a) or (b). If it is feasible to take the segment out of service, paragraph (a) applies and the repair must meet § 192.245 inspection requirements. The letter is narrow, but it is still the posted interpretation on that section.

Topics: 192.715; full-encirclement welded split sleeves; girth-weld repair; taking a line out of service.

[Official page](https://www.phmsa.dot.gov/regulations/title49/interp/pi-71-007)

#### 13 March 1987 — Alert Notice ALN-87-01 (King of Prussia sleeve fillet weld)

Historical alert about a 7 October 1986 failure on a 14-inch API 5LX-52 line at King of Prussia, Pennsylvania, less than a month after a full-encirclement repair sleeve was fillet-welded to the pipe. Contemporary industry discussion of the notice focuses on the hazard of using cellulosic (non-low-hydrogen) electrodes for sleeve-end fillet welds on in-service pipe. Because no official text could be downloaded and verified, this entry is included for completeness with that caveat.

Topics: Full-encirclement repair sleeves; in-service fillet welding; hydrogen cracking.

#### 21 March 1991 — Interpretation PI-91-007 (mechanical repair sleeve)

This is the classic U.S. letter on when sleeve ends must be welded to the carrier pipe. Asked by PLIDCO whether §§ 192.713(a)(2) and 192.715(c) always require circumferential fillet welds, OPS said no: if the defect is not leaking and is not reasonably expected to leak, a full-encirclement sleeve may reinforce the pipe without welding the ends (a Type A installation). If the defect is leaking or may reasonably be expected to leak, the sleeve ends must be permanently sealed — by fillet welds or another suitable means — so the sleeve can contain pressure (Type B). The two half-shells themselves must be joined by welding; mechanical joining of the halves is allowed only where the rule expressly says so (then, submerged lines).

Topics: Type A vs Type B sleeves; 192.713; 192.715; circumferential fillet welds; "welded split sleeve".

[Official page](https://www.phmsa.dot.gov/regulations/title49/interp/pi-91-007)

#### 27 February 1995 — Composite-wrap waiver

RSPA granted listed interstate gas-transmission operators a waiver from then-§ 192.713(a) so they could use Clock Spring composite wrap, instead of cutting out pipe or installing a welded split sleeve, on high-stress lines. The waiver came with conditions (manufacturer procedures, GRI WRAP protocol, periodic statistical excavation of a sample of sites, reporting, and qualified installers). It is the special-permit origin story for composite repairs on U.S. gas transmission lines. It was later overtaken by the 1999 repair-methods rule, which opened a performance-based path for any method proven by tests and analysis.

Topics: Composite wrap; Clock Spring; 192.713; special permit / waiver; permanent repair.

[Official page](https://www.federalregister.gov/documents/1995/02/27/95-4704/grant-of-waiver-repair-of-gas-transmission-lines) · [Local PDF](/downloads/guidance/1995-02-27-clock-spring-waiver-60-fr-10630.pdf)

#### 8 September 1995 — Interpretation PI-95-036 (composite reinforcement)

Clarifies the 1995 waiver. Site monitoring does not mean excavating every repair; only a statistically significant sample had to be dug up every two years under the GRI plan. Pipe repaired under the waiver did not have to be replaced later just to satisfy then-§ 192.713(a). Still the posted interpretation tied to that section for Clock Spring.

Topics: Clock Spring; composite wrap; monitoring; whether later replacement is required.

[Official page](https://www.phmsa.dot.gov/regulations/title49/interp/pi-95-036)

#### 14 December 1999 — Final rule: Gas and Hazardous Liquid Pipeline Repair

This is a binding rule, not guidance, but it is the reason composite sleeves and other non-traditional repairs can be permanent under U.S. federal law. It amended the gas and hazardous-liquid repair sections so that, in addition to the listed methods (cut-out, welded split sleeve, and certain clamps or patches), an operator may "apply a method that reliable engineering tests and analyses show can permanently restore the serviceability of the pipe." RSPA said the change would let proven innovations (explicitly including composite wrap) be used without a case-by-case waiver, without reducing safety. Today's arguments about whether a composite can be a permanent leak repair still start from this language (now in §§ 192.713, 192.717(b)(5), 195.585(a)(2), and related sections).

Topics: 192.309, 192.485, 192.487, 192.713, 192.717, 195.422, 195.569, 195.585; composite and other alternative repairs; "reliable engineering tests and analyses".

[Official page](https://www.govinfo.gov/content/pkg/FR-1999-12-14/html/99-32274.htm) · [Local PDF](/downloads/guidance/1999-12-14-final-rule-pipeline-repair-methods-64-fr-69660.pdf)

#### 8 October 2003 — ADB-03-05, Stress Corrosion Cracking (SCC) Threat

Advises gas and hazardous-liquid operators that SCC is a real threat and must be considered in integrity-management programs. Operators should evaluate susceptibility, choose appropriate assessment methods (ILI, hydrostatic testing, or other verification), and remediate injurious cracks. It does not prescribe a particular sleeve or wrap, but it is the foundational federal SCC advisory that later crack-repair criteria and the Marshall lessons bulletin build on.

Topics: SCC; cracks; integrity management; assessment and remediation.

[Official page](https://www.federalregister.gov/documents/2003/10/08/03-25421/pipeline-safety-stress-corrosion-cracking-scc-threat-to-gas-and-hazardous-liquid-pipelines) · [Local PDF](/downloads/guidance/2003-10-08-adb-03-05-stress-corrosion-cracking-68-fr-58166.pdf)

#### 30 September 2009 — ADB-09-02, Weldable Compression Coupling Installation

Issued after a 2007 crude-oil release and fire (two fatalities) during a pipe replacement that used weldable compression couplings. The couplings had been modified by cutting off about half the clamping bolts, contrary to the manufacturer, and the line was restarted at a pressure appropriate only for a fully anchored installation. PHMSA tells operators to follow manufacturer procedures, not to make unauthorized field modifications, to train and qualify installers, to distinguish anchored from un-anchored allowable pressures, and to control start-up and hazard zones before the coupling is welded into a permanent repair.

Topics: Weldable compression couplings; mechanical repair devices; installation procedures; in-service welding; start-up pressure.

[Official page](https://www.federalregister.gov/documents/2009/09/30/E9-23527/pipeline-safety-weldable-compression-coupling-installation) · [Local PDF](/downloads/guidance/2009-09-30-adb-09-02-weldable-compression-coupling-74-fr-50272.pdf)

#### 24 March 2010 — ADB-10-03, Girth Weld Quality Issues

Warns operators of quality problems in girth welds on large-diameter, high-grade line pipe, especially 2008–2009 construction, caused by poor transitions between different wall thicknesses, misalignment, and poor welding practice. Operators were told to review construction records and engineering-assess suspect welds. It is about weld quality rather than a specific repair product, but it is the main federal advisory behind later girth-weld repair and sleeve-over-weld decisions.

Topics: Girth welds; misalignment; wall-thickness transitions; welding practices; large-diameter, high-strength pipe.

[Official page](https://www.federalregister.gov/documents/2010/03/24/2010-6528/pipeline-safety-girth-weld-quality-issues-due-to-improper-transitioning-misalignment-and-welding) · [Local PDF](/downloads/guidance/2010-03-24-adb-10-03-girth-weld-quality-75-fr-14243.pdf)

#### 18 November 2010 — Interpretation PI-10-0013 (pipe-lining repair)

Answers three questions about the 1999 "reliable engineering tests and analyses" repair option. PHMSA said the rules do not set a numeric cap on how many alternative repairs may be applied, but the tests must show the method restores original design strength and will survive the real environment (loads, movement, soil) for its intended life, and operators should think hard before covering a badly deteriorated joint with a large number of repairs. Alternative repairs **cannot** be used to raise a segment above its established maximum operating pressure or original design strength, and they **cannot** substitute for the class-location MAOP review under §§ 192.609 and 192.611.

Topics: Alternative / composite or steel-wrap repairs; 192.309, 192.485, 192.487, 192.713, 192.717, 195.585; MAOP; class location.

[Official page](https://www.phmsa.dot.gov/regulations/title49/interp/pi-10-0013)

#### 10 January 2011 — ADB-11-01, MAOP/MOP Records and Integrity Management

Post-San Bruno advisory that operators must support MAOP or MOP with traceable, reliable, complete records that actually describe the pipe. Incomplete records are not good enough; operators may need in-situ examination, pressure testing, or NDT. It also pushes more rigorous threat identification, data integration, and preventive and mitigative measures. Repair decisions that depend on material properties or pressure limits sit on top of this records standard.

Topics: MAOP/MOP records; traceable, verifiable, complete records; integrity-management threat identification.

[Official page](https://www.federalregister.gov/documents/2011/01/10/2011-208/pipeline-safety-establishing-maximum-allowable-operating-pressure-or-maximum-operating-pressure) · [Local PDF](/downloads/guidance/2011-01-10-adb-11-01-maop-records-and-integrity-management-76-fr-1504.pdf)

#### 25 July 2012 — NTSB Safety Recommendations P-12-3 through P-12-10 (Marshall, Michigan)

The recommendation that most directly shaped later repair criteria is **P-12-3**: PHMSA should revise 49 CFR 195.452 so it clearly says when an engineering assessment of crack defects (including environmentally assisted cracks) is required; what methods are acceptable, including cracks coinciding with corrosion and a safety factor for sizing uncertainty; when a probable crack must be excavated and by when; what pressure limits apply to unexcavated cracks; and how to calculate crack growth (fatigue, corrosion fatigue, or SCC) for any crack left in the pipe. **P-12-4** asks PHMSA to tighten the "discovery of condition" rule so that if the operator cannot make a threat determination within 180 days, it must notify PHMSA and say when it will have adequate information. These are recommendations to the regulator, not operator guidance, but they are the NTSB record behind later crack-repair rulemaking.

Topics: Crack defects; 195.452 repair criteria; engineering assessment; excavation timing; pressure restrictions; crack growth.

[Official page](https://www.ntsb.gov/safety/safety-recs/recletters/P-12-003-010.pdf) · [Local PDF](/downloads/guidance/2012-07-25-ntsb-p-12-003-to-p-12-010-marshall-recommendations.pdf)

#### 28 August 2013 — ADB-2013-04, Recall of Leak Repair Clamps

Alerts gas and hazardous-liquid operators that T.D. Williamson had recalled leak-repair clamps because of defective seals that could fail and leak. Operators were told to check installation records, stop using the affected clamps, and follow the manufacturer's recall instructions. It is product-specific, but it is the federal advisory on bolt-on leak clamps as a repair method.

Topics: Leak repair clamps; T.D. Williamson; defective seals; temporary leak repair.

[Official page](https://www.federalregister.gov/documents/2013/08/28/2013-20910/pipeline-safety-notice-to-operators-of-hazardous-liquid-and-natural-gas-pipelines-of-a-recall-on) · [Local PDF](/downloads/guidance/2013-08-28-adb-2013-04-leak-repair-clamp-recall-78-fr-53190.pdf)

#### 6 May 2014 — ADB-2014-02, Lessons Learned from the Release at Marshall, Michigan

PHMSA's advisory digest of what the Enbridge Line 6B failure taught operators about managing crack threats. It stresses adequate procedures for identifying, evaluating, and remediating crack-like defects, the limits of ILI, data integration, and timely discovery and repair under the hazardous-liquid IM rule. Together with NTSB P-12-3, it is the main federal "cracks and repairs" advisory of the 2010s.

Topics: Cracks; ILI; integrity management; hazardous liquid lines; discovery and repair.

[Official page](https://www.federalregister.gov/documents/2014/05/06/2014-10248/pipeline-safety-lessons-learned-from-the-release-at-marshall-michigan) · [Local PDF](/downloads/guidance/2014-05-06-adb-2014-02-lessons-learned-marshall-79-fr-25990.pdf)

#### 18 September 2014 — ADB-2014-04, Flow Reversals, Product Changes, and Conversion to Service

Advises operators that reversing flow, changing commodity, or converting a line to a new service can change pressure-cycle fatigue and crack-growth rates and can invalidate prior integrity assessments. Operators should review IM programs, consider additional assessment, and address defects before or as part of the change. Relevant to repair planning because a sleeve or wrap that was adequate under the old cycle count may not be adequate after a reversal or product change.

Topics: Flow reversal; product change; fatigue; crack growth; integrity assessment before operating-condition changes.

[Official page](https://www.federalregister.gov/documents/2014/09/18/2014-22202/pipeline-safety-guidance-for-pipeline-flow-reversals-product-changes-and-conversion-to-service) · [Local PDF](/downloads/guidance/2014-09-18-adb-2014-04-flow-reversals-product-changes-79-fr-56121.pdf)

#### 21 June 2016 — ADB-2016-04, Corrosion under Insulated Coatings

Issued after the 2015 Plains Line 901 rupture near Santa Barbara. PHMSA warns that insulated or wrap-type coatings on buried pipe can shield cathodic protection and trap moisture, so ordinary CP surveys and some ILI programs miss corrosion. Operators should confirm that coating and CP actually protect insulated pipe, use suitable ILI and analysis, consider more frequent reassessment and leak detection, and apply more stringent repair criteria where corrosion under insulation or under disbonded coating is suspected.

Topics: Corrosion under insulation; CP shielding; ILI; repair criteria for CUI; coatings.

[Official page](https://www.federalregister.gov/documents/2016/06/21/2016-14651/pipeline-safety-ineffective-protection-detection-and-mitigation-of-corrosion-resulting-from) · [Local PDF](/downloads/guidance/2016-06-21-adb-2016-04-corrosion-under-insulated-coatings-81-fr-40398.pdf)

#### 16 March 2017 — ADB-2017-01, Deactivation of Threats

Tells operators not to "turn off" an integrity threat in their IM program unless they have technically justified, documented reasons and continue to collect data that would show the threat has returned. It matters for repair programs because deactivating a threat (for example cracks, dents, or hard spots) can delay assessment and remediation. Later hard-spot recommendations (NTSB P-22-5) return to this theme.

Topics: Integrity-management threats; when a threat may be treated as inactive; data integration.

[Official page](https://www.federalregister.gov/documents/2017/03/16/2017-05262/pipeline-safety-deactivation-of-threats) · [Local PDF](/downloads/guidance/2017-03-16-adb-2017-01-deactivation-of-threats-82-fr-14106.pdf)

#### 15 September 2020 — FAQs on the Gas Transmission Final Rule, Batch 1 (RIN 1)

First batch of FAQs on the 2019 "RIN 1" Safety of Gas Transmission Pipelines rule (MAOP reconfirmation, material verification, and expanded assessments). It is not a sleeve bulletin, but it is the official explanation of how operators analyze predicted failure pressure and material properties — analysis that §§ 192.712, 192.713, 192.714, and 192.933 then use to schedule repairs. PHMSA repeats the usual disclaimer that FAQs are guidance, not new law.

Topics: 2019 gas-transmission rule; MAOP reconfirmation; material properties; 192.712 analysis used in later repair decisions.

#### 26 August 2021 — Gas Transmission Integrity Management FAQs

Long-standing FAQ set for the gas-transmission integrity-management rule, including how operators treat immediate-repair conditions (prompt pressure reduction or shutdown until repair), scheduled conditions, and monitored conditions in HCAs under § 192.933. The 2022 RIN 2 rule later added parallel non-HCA criteria in § 192.714 and revised some HCA thresholds; this FAQ set remains the posted IM FAQ compilation as of the 2021 revision.

Topics: 192.933 HCA repair criteria; immediate, one-year, and monitored conditions.

#### 15 August 2022 — NTSB Pipeline Investigation Report PIR-22/02 and Recommendations P-22-1 through P-22-6 (Danville, Kentucky)

The report finds a rupture originating at a hard spot that cracked under hydrogen-related conditions. **P-22-3**, issued to PHMSA, asked the agency to warn gas-transmission operators about the limits of hard-spot magnetic-flux-leakage ILI tools and analyses and to reinforce industry best practices for ILI data analysis. PHMSA's later ADB-2024-01 is the advisory that responds to that recommendation (NTSB later closed P-22-3 as acceptable action). P-22-5, to the operator, addresses documenting whether hard-spot and corrosion threats are active and how they interact — which drives whether a hard spot is repaired, monitored, or reassessed.

Topics: Hard spots; hydrogen-induced cracking; ILI tool limitations; threat interaction; repair/response.

[Local PDF](/downloads/guidance/2022-08-15-ntsb-pir-22-02-danville-ky-hard-spot-rupture.pdf)

#### 2 November 2022 — Temporary Repair and Permanent Repair FAQs

PHMSA's FAQ on a practical problem: temporary repairs left on a line as if they were permanent. It walks through when gas gathering, HCA transmission, non-HCA transmission, and hazardous-liquid operators must make a permanent repair, what "as soon as feasible" and the IM clocks mean, and what belongs in procedures for a temporary repair (including a plan to replace it, and pressure reduction if needed). For liquid lines it points to Part 195 repair and IM sections and to ASME B31.4 examples of permanent methods. It is guidance, not a new rule. This is one of the two documents already in hand for the site.

Topics: Temporary vs permanent repairs; 192.711, 192.714, 192.933; 195.401, 195.422, 195.452, 195.585.

[Local PDF](/downloads/guidance/2022-11-02-phmsa-temporary-permanent-repair-faqs.pdf)

#### 19 April 2023 — FAQs on the Gas Transmission Final Rule, Batch 2 (RIN 1)

Second batch of official FAQs on the 2019 (RIN 1) gas-transmission rule, posted on the same PHMSA guidance page as Batch 1. It continues the implementation Q&A for MAOP reconfirmation, assessments, and related Part 192 amendments that feed repair and analysis decisions. Like Batch 1, it is guidance.

Topics: 2019 gas-transmission rule, second FAQ batch.

#### 10 January 2024 — 2022 Safety of Gas Transmission Final Rule FAQs (RIN 2)

Official FAQ set for the August 2022 "RIN 2" rule (87 FR 52224), which created non-HCA repair criteria in § 192.714 and revised HCA criteria in § 192.933. Among other questions, it explains how to judge whether a "monitored" condition will grow to scheduled-repair size before the next assessment (FAQ 5) and how to treat a condition if critical strain is exceeded (FAQ 6): it is no longer a monitored condition and must be prioritized for evaluation and remediation under the immediate/scheduled/monitored scheme. This is the current federal FAQ specifically aimed at the mega-rule repair criteria.

Topics: 192.714 repair criteria; 192.933 monitored conditions; anomaly growth; critical strain; 192.712.

[Local PDF](/downloads/guidance/2024-01-10-phmsa-2022-safety-of-gas-transmission-final-rule-faqs-rin2.pdf)

#### 18 November 2024 — ADB-2024-01, Identification and Evaluation of Potential Hard Spots

Warns that hard spots are more widespread than older "one mill / one era" assumptions: recent data and incidents show they can affect multiple pipelines made before 1970, regardless of manufacturer. If missed, they can crack when coating, soil chemistry, or hydrogen exposure interact with the hard metal. PHMSA advises operators to expand hard-spot evaluation to pre-1970 pipe, collect and analyze hard-spot MFL ILI data, and follow industry best practices in that analysis. This is the federal hard-spot advisory (and the response to NTSB P-22-3). It discusses assessment and threat management more than a prescribed repair method; repairs still follow Parts 192/195.

Topics: Hard spots; pre-1970 pipe; MFL ILI; hydrogen-induced cracking; interacting threats.

[Official page](https://www.federalregister.gov/documents/2024/11/18/2024-26725/pipeline-safety-identification-and-evaluation-of-potential-hard-spots-in-line-inspection-tools-and) · [Local PDF](/downloads/guidance/2024-11-18-adb-2024-01-hard-spots-89-fr-90827.pdf)

#### 12 September 2025 — Hazardous Liquid Integrity Management FAQs (revision)

Current official FAQ compilation for the hazardous-liquid integrity-management rule, including the § 195.452(h) repair clocks (immediate, 60-day, and 180-day conditions) for metal loss, dents, cracks, and related anomalies. The 12 September 2025 revision is the version posted as of this research. Use this, not an older Liquid IM FAQ file, when citing current PHMSA Q&A on liquid repair criteria.

Topics: 195.452 repair criteria; immediate, 60-day, and 180-day conditions; discovery.

#### 8 July 2026 — NPRM: Repair Criteria for Hazardous Liquid and Gas Transmission Pipelines

A **proposed** rule, not final guidance. PHMSA proposes to modernize and align anomaly-response and repair criteria for gas transmission and hazardous-liquid lines, including how "discovery" is timed from preliminary vs final ILI reports, and to extend certain recent gas-transmission safety improvements to liquid lines. It should be watched and summarized for readers, but it must be labeled as a proposal until PHMSA issues a final rule. It is not the "2026 sleeve guidance"; that is ADB-2026-02.

Topics: 192.714; 195.452 / proposed 195.453; discovery; anomaly evaluation; repair criteria alignment.

[Official page](https://www.federalregister.gov/documents/2026/07/08/2026-13805/pipeline-safety-repair-criteria-for-hazardous-liquid-and-gas-transmission-pipelines) · [Local PDF](/downloads/guidance/2026-07-08-nprm-repair-criteria-91-fr-42272.pdf)

## Canada

Canadian pipelines are regulated federally by the Canada Energy Regulator and provincially by bodies such as the Alberta Energy Regulator and the BC Energy Regulator. The common technical base is CSA Z662, which regulators make binding by reference. Each entry below summarizes the source and links to the regulator's own page. This site does not host CSA text.

#### CSA Z662, Oil and Gas Pipeline Systems

The national standard for design, construction, operation, maintenance, and repair of oil and gas pipeline systems, with repair in Clause 10. The ninth edition is Z662:23. Described on [CSA Z662](/codes/csa-z662/), including where the standard can be accessed.

Topics: Clause 10 repair; temporary repairs; composite reinforcement; engineering assessment.

#### Canada Energy Regulator: Onshore Pipeline Regulations and guidance

The OPR (SOR/99-294) apply to CER-regulated pipelines and treat repair as part of operating the pipeline. The CER publishes guidance notes and operation and maintenance guidelines, including the circumstances that need advance notice. Official pages: [Onshore pipeline regulations, guidance notes and related documents](https://www.cer-rec.gc.ca/en/about/acts-regulations/cer-act-regulations-guidance-notes-related-documents/onshore-pipeline/index.html). Summary: [CER Onshore Pipeline Regulations](/regulations/cer-onshore-pipeline-regulations/).

Topics: OPR; guidance notes; operation and maintenance activities; notification.

#### Canada Energy Regulator: safety and information advisories

Advisories on dent evaluation (SA 2025-01), girth-weld strain failures (SA 2020-01), fitting materials quality assurance (SA 2024-01), and new CSA standard editions (IA 2023-001, IA 2025-001). Official index: [Safety and Information Advisories](https://www.cer-rec.gc.ca/en/safety-environment/industry-performance/information-safety-advisories/). Summary: [CER safety and information advisories](/regulations/cer-safety-and-information-advisories/).

Topics: dents; API RP 1183; girth welds; component quality assurance.

#### Alberta Energy Regulator: Pipeline Act, Pipeline Rules, Directive 077

The Pipeline Rules (Alberta Regulation 125/2023) make CSA Z662 the minimum requirement, require an engineering assessment for composite or other repair materials and methods outside Z662, and require integrity confirmation before return to service after repair. Directive 077 (effective 2 July 2026) is current; Directive 066 is rescinded. Official page: [Directive 077](https://www.aer.ca/regulating-development/rules-and-directives/directives/directive-077). Summary: [Alberta Pipeline Rules and AER](/regulations/alberta-pipeline-rules-and-aer/).

Topics: Pipeline Rules; engineering assessment for composite repair; integrity management; Directive 077.

#### BC Energy Regulator: Pipeline Regulation and Operations Manual

The Pipeline Regulation (B.C. Reg. 281/2010) requires work in accordance with CSA Z662 and an integrity management program per Annex N. The BCER's Operations Manual describes the notice of intent for pipeline repair, including sleeve repairs. Official page: [Pipelines](https://www.bc-er.ca/what-we-regulate/oil-gas/pipelines/). Summary: [BC Pipeline Regulation and BCER](/regulations/bc-pipeline-regulation-and-bcer/).

Topics: notice of intent; temporary repair engineering assessment; integrity management protocol.

#### Saskatchewan and Ontario

Saskatchewan licenses pipelines under The Pipelines Act, 1998, the Pipelines Administration and Licensing Regulations, and Directive PNG034, and applies the most recent published CSA Z662. Ontario regulates oil and gas pipeline systems under O. Reg. 210/01. Official pages: [Saskatchewan pipeline licensing](https://www.saskatchewan.ca/business/agriculture-natural-resources-and-industry/oil-and-gas/oil-and-gas-licensing-operations-and-requirements/pipeline-licensing) and [O. Reg. 210/01](https://www.ontario.ca/laws/regulation/010210). Summary: [Saskatchewan and Ontario](/regulations/saskatchewan-and-other-provinces/).

Topics: PNG034; PALR; provincial licensing; inspection of repairs.

#### Transportation Safety Board of Canada: pipeline investigations

Independent investigation reports on occurrences on federally regulated pipelines. Official index: [Pipeline investigation reports](https://www.tsb.gc.ca/eng/rapports-reports/pipeline/index.html). Summary: [TSB pipeline investigation reports](/regulations/tsb-pipeline-investigation-reports/).

Topics: investigations; stress corrosion cracking; external corrosion; findings.

#### 10 October 2024 — ABSA AB-539, Engineered Composite Systems for Pressure Equipment Alterations (Edition 2), and IB24-009

Alberta's official standard for using an engineered composite system to restore pressure equipment. Installation of an ECS to reinforce a thin area or restore structural integrity is treated as an **alteration**, so the design must be registered before work starts (IB24-009). AB-539 sets supplier qualification, Type A vs Type B defect testing, design methods, installer competence, inspection, monitoring, and removal. It is based on ASME PCC-2 Article 204 and ISO 24817. Scope is Alberta pressure equipment (which can include pipework under PESR); it is not a CER or CSA Z662 substitute for federally regulated pipelines, but it is the leading Canadian regulator document on engineered composites. See [AB-539 and composite alterations](/regulations/ab-539-composite-alterations/).

Topics: Engineered composite systems; Type A and Type B defects; qualification; design registration; ISO 24817 / ASME PCC-2.

## International and other

#### UK Health and Safety Executive — L82, *A guide to the Pipelines Safety Regulations 1996*

Official HSE guide to the Pipelines Safety Regulations 1996, which apply to pipelines in Great Britain and most UK Continental Shelf lines. It explains legal duties; it does **not** prescribe Type A/B sleeves or composite qualification the way PHMSA or ABSA documents do. Technical practice in the UK typically sits in IGEM/UKOPA and Energy Institute documents (copyrighted industry guidance, not listed as regulator documents here).

Topics: UK pipeline legal duties; integrity management in general.

[Official page](https://www.hse.gov.uk/pubns/books/l82.htm)

## Sources

- [ADB-2026-02, 91 FR 3780](https://www.federalregister.gov/documents/2026/01/28/2026-01675/pipeline-safety-advisory-bulletin-on-the-integrity-risks-of-type-a-repair-sleeves) — Federal Register
- [Repair criteria NPRM, 91 FR 42272](https://www.federalregister.gov/documents/2026/07/08/2026-13805/pipeline-safety-repair-criteria-for-hazardous-liquid-and-gas-transmission-pipelines) — Federal Register
- [Safety and Information Advisories](https://www.cer-rec.gc.ca/en/safety-environment/industry-performance/information-safety-advisories/) — Canada Energy Regulator
- [Directive 077: Pipelines, Requirements and Reference Tools](https://www.aer.ca/regulating-development/rules-and-directives/directives/directive-077) — Alberta Energy Regulator
- [L82, A guide to the Pipelines Safety Regulations 1996](https://www.hse.gov.uk/pubns/books/l82.htm) — Health and Safety Executive