# Part 192 repair and integrity duties

In short. The gas transmission sections that govern design pressure, corrosion remediation, leak repair, predicted failure pressure, and repair schedules.

Part 192 is the gas pipeline safety code. Repair shows up in more than one subpart, and the sections do different jobs.

## Design pressure is not MAOP

[Section 192.105](https://www.ecfr.gov/current/title-49/section-192.105) sets design pressure for steel pipe:

$$
P = \frac{2St}{D} \times F \times E \times T
$$

S is yield strength under §192.107, D and t are nominal outside diameter and nominal wall, F is the design factor in [§192.111](https://www.ecfr.gov/current/title-49/section-192.111) (0.72, 0.60, 0.50, and 0.40 for the basic Class 1 through Class 4 cases, with exceptions), E is the longitudinal joint factor in §192.113, and T is the temperature derating factor in §192.115. MAOP is established under Subpart L, including §192.619, and can be lower than design pressure because of test pressure or operating history. The [calculator](/assessment/calculators) returns design pressure and labels it that way.

## Corrosion remediation and predicted failure pressure

[Section 192.485](https://www.ecfr.gov/current/title-49/section-192.485) covers transmission lines. General corrosion that leaves less wall than the MAOP requires must be replaced, repaired by a method shown to restore serviceability, or derated to the remaining wall. Pitting grouped tightly enough to affect overall strength counts as general corrosion. Localized pitting that could leak is replaced, repaired, or derated. Remaining strength is documented under [§192.712](https://www.ecfr.gov/current/title-49/section-192.712).

Section 192.712 is the analysis section. For corrosion metal loss the operator uses ASME B31G, RSTRENG, or an equally conservative method. A less conservative method needs advance notice under §192.18. Dents and other mechanical damage that can create a stress riser need a procedure under paragraph (c). Cracks need a fracture-mechanics model matched to the failure mode and the material, and a fatigue analysis when the segment cycles, with the remaining life re-evaluated before half of it has been used up. Missing material properties fall back to paragraph (e), including conservative Charpy energies where records are not traceable, verifiable, and complete. How long a repair description itself must be kept, and what a sleeve file has to say, is in [repair records](/regulations/repair-records/). Preferential metal loss on a vintage LF-ERW seam is not the same threat as body-wall corrosion; that seam is in [LF-ERW seams](/assessment/lf-erw-seams/).

## Repair methods

[Section 192.713](https://www.ecfr.gov/current/title-49/section-192.713) applies to imperfections and damage that impair serviceability on steel transmission pipe at or above 40 percent of SMYS: cut out a cylinder, or use a method that tests and analyses show will permanently restore serviceability. Pressure stays at a safe level during the work.

[Section 192.717](https://www.ecfr.gov/current/title-49/section-192.717) is the leak list: cut-out; a full-encirclement welded split sleeve; a bolt-on clamp if the leak is a corrosion pit; a limited fillet-welded patch on pipe not above 40,000 psi SMYS; a mechanical sleeve in specified submerged cases; or a performance-based alternative. Composite wrap is not named.

## Schedules, after the 2022 rule and the 2025 correction

Two sections carry repair timing. [Section 192.933](https://www.ecfr.gov/current/title-49/section-192.933) is the integrity-management section for covered segments in high consequence areas. [Section 192.714](https://www.ecfr.gov/current/title-49/section-192.714) is the repair-criteria section for other onshore transmission pipe that is not on an alternative MAOP. Both tell the operator to follow ASME B31.8S section 7, Figure 7.2.1-1, except where they list special conditions.

The 15 January 2025 correction, issued after the D.C. Circuit’s decision in INGAA v. PHMSA, removed three things from the 2022 rule: the internal-corrosion monitoring section §192.478; the immediate-repair trigger for cracks with predicted failure pressure at or below 1.25 times MAOP; and high-frequency ERW as one of the seam types in the immediate preferential-metal-loss criterion.

PHMSA’s July 2026 proposal describes the gas criteria that remained, and it is the clearest public restatement of that current text. Immediate conditions include metal loss whose predicted failure pressure is at or below 1.1 times MAOP; metal loss greater than 80 percent of nominal wall; a dent on the upper two-thirds of the pipe that has metal loss, cracking, or a stress riser, unless an engineering analysis shows critical strain is not exceeded; cracks at 50 percent of wall thickness; and preferential metal loss on specified vintage seams (DC-ERW, LF-ERW, EFW, or a joint factor below 1.0) at a failure-pressure ratio below 1.25. Near-term response is one year in HCAs and two years elsewhere. Read the current paragraphs before relying on this sentence. The proposal would change several of these numbers. It is not in force. Temporary pressure reductions, when the schedule cannot be met, are specified in §192.933: 80 percent of the pressure at discovery, or a pressure tied to predicted failure pressure, with notice to PHMSA if even that cannot be done.

Discovery starts the clock. The operator has to know enough to decide the condition may be a threat, generally within 180 days of the assessment. “We have not finished the spreadsheet” is not, by itself, a reason the clock has not started.

## Sources

- [49 CFR 192.105](https://www.ecfr.gov/current/title-49/section-192.105) — eCFR
- [49 CFR 192.111](https://www.ecfr.gov/current/title-49/section-192.111) — eCFR
- [49 CFR 192.485](https://www.ecfr.gov/current/title-49/section-192.485) — eCFR
- [49 CFR 192.712](https://www.ecfr.gov/current/title-49/section-192.712) — eCFR
- [49 CFR 192.713](https://www.ecfr.gov/current/title-49/section-192.713) — eCFR
- [49 CFR 192.714](https://www.ecfr.gov/current/title-49/section-192.714) — eCFR
- [49 CFR 192.717](https://www.ecfr.gov/current/title-49/section-192.717) — eCFR
- [49 CFR 192.933](https://www.ecfr.gov/current/title-49/section-192.933) — eCFR
- [2025 corrections after INGAA v. PHMSA](https://www.federalregister.gov/documents/2025/01/15/2025-00073/pipeline-safety-safety-of-gas-transmission-pipelines-repair-criteria-integrity-management) — Federal Register
- [2026 repair-criteria NPRM, description of existing gas criteria](https://www.federalregister.gov/documents/2026/07/08/2026-13805/pipeline-safety-repair-criteria-for-hazardous-liquid-and-gas-transmission-pipelines) — Federal Register