# How to read PHMSA sources

In short. Regulations, the Federal Register, advisory bulletins, interpretations, FAQs, and research reports do not have the same legal weight.

PHMSA publishes several kinds of documents, and they do not all bind an operator the same way. Mixing them up is how a bulletin gets cited as if it were a new section of the code.

**Regulations** in 49 CFR Parts 190 through 195 are the rules. Part 192 is gas. Part 195 is hazardous liquids and carbon dioxide. The eCFR is the convenient daily text and is unofficial. The Federal Register version of a final rule, and the annual Code of Federal Regulations, are the legal publications. When this site and the eCFR disagree, open the eCFR and then the Federal Register if the amendment history matters.

**Final rules** in the Federal Register explain why the text changed. The preamble is the agency’s reasoning. It is the first place to look when a section is ambiguous, and it is not itself operative text. The 2019 and 2022 gas transmission rules are summarized on their own page because “Mega Rule” is a nickname for that pair, not a citation.

**Proposed rules** are invitations to comment. The 8 July 2026 repair-criteria NPRM is a proposal. It describes current requirements in order to explain what it would change. Those descriptions are useful. They are not a substitute for the code of federal regulations, and the proposal’s new sections are not requirements.

**Advisory bulletins** are notices. ADB-2026-02 says so: it does not restrict Type A sleeves and does not impose a new duty. A bulletin can still be the clearest public description of a failure mode. Cite it as guidance.

**Interpretations** answer one request under 49 CFR 190.11. They apply the existing rule to the facts the requester described. PI-17-0014 (withdrawn in 2025) and PI-24-0003 are examples on this site. They do not amend the section. A letter about someone else’s pipeline is persuasive context, not a waiver for yours.

**FAQs** are staff guidance gathered so the same question is not answered differently every week. PHMSA’s temporary-versus-permanent repair FAQs are in that category. The guidance portal states the limit: guidance lacks the force of law unless a statute or a contract provides otherwise.

**Research reports** hosted by PHMSA or BSEE are technical records of a contract. They recommend. They do not approve a product, and a single test series is not a design allowable for every diameter and grade.

The rest of this section uses that stack on purpose. Each article says whether it is describing a duty or a document that explains a duty.

## Sources

- [PHMSA guidance portal](https://www.phmsa.dot.gov/guidance) — PHMSA
- [Letters of interpretation](https://www.phmsa.dot.gov/regulations/title49/b/2/1) — PHMSA
- [Notices and advisory bulletins](https://www.phmsa.dot.gov/standards-rulemaking/notices-and-advisory-bulletins) — PHMSA
- [49 CFR Part 192](https://www.ecfr.gov/current/title-49/part-192) — eCFR
- [49 CFR Part 195](https://www.ecfr.gov/current/title-49/part-195) — eCFR