---
title: "Backing-strip mill groove on a Type B sleeve, 2021"
description: "Two 12-inch Type B sleeves, one with a long-seam mill groove and one without, both reached 100,000 pressure cycles without a sleeve failure."
section: test-reports
updated: 2026-11-25
canonical: https://pipelinerepairs.com/test-reports/backing-strip-mill-groove-2021/
markdown: https://pipelinerepairs.com/articles/test-reports/backing-strip-mill-groove-2021.md
---

# Backing-strip mill groove on a Type B sleeve, 2021

In short. Two 12-inch Type B sleeves, one with a long-seam mill groove and one without, both reached 100,000 pressure cycles without a sleeve failure.

Source: Allan Edwards, Inc.; testing by ADV Integrity, Inc. (2021). Report 100306-RP03-Rev0-110221, November 2021. Mark Holland, David Futch, PE, and Dr. Chris Alexander, PE.

## What was tested

Whether a mill groove that lets a long-seam backing strip sit against the pipe changes the cyclic life of a Type B sleeve. Two 12-inch sleeves, one grooved and one not, reinforced dents.

## Setup

Pressure cycled from 132 psig (8 percent of SMYS) to 1,318 psig (80 percent of SMYS), toward a 100,000-cycle runout.

## Key numbers

Both samples reached 100,000 cycles without a sleeve failure. The grooved sample leaked at a pressure port in the end cap at 92,416 cycles. That port was repaired and cycling continued to runout with no further leak.

## Takeaways

The leak was isolated to the end-cap port, not the sleeve. On this program the mill groove did not produce a sleeve failure inside 100,000 cycles.

[Download the report](/downloads/type-b-sleeve-backing-strip-mill-groove-2021.pdf).

## Sources

- [Backing-strip mill groove on a Type B sleeve, 2021](/downloads/type-b-sleeve-backing-strip-mill-groove-2021.pdf) — Allan Edwards / ADV Integrity
