# Composite repairs of corroded riser pipe under pressure, tension, and bending, 2007

In short. On 8.625-inch X46 pipe with a 0.200-inch circumferential groove, unrepaired pipe burst at 3,694 psi. Three reported composite repairs burst between 6,921 and 7,641 psi, all in steel away from the repair.

Source: Ochoa, O. O. (Texas A&M University), and Alexander, C. (Stress Engineering Services, Inc.). *Composite Repair Methods for Steel Pipes, Research Activities Summary Report.* Supplemental project report prepared for the Minerals Management Service under MMS/OTRC Cooperative Research Agreement 1435-01-04-CA-35515, Task Order 39300, MMS Project Number 558, June 2007.

## What was tested

Four commercial composite repair systems, and an unrepaired control, on 8.625-inch outside diameter, 0.406-inch wall, Grade X46 pipe. A circumferential groove 0.200 inches deep was machined around the pipe to simulate corrosion. Each system was tested in three configurations: pressure to failure; pressure held constant with axial tension increased to failure; and pressure and tension held constant with four-point bending increased until large yielding occurred in the steel.

## Setup

The stated design loads were 2,887 psi internal pressure (72 percent of a 4,000 psi yield pressure, from the ASME B31.8 design basis used in the report), 145 kips axial tension, and a 17.5-kip bending force (51 kip-feet). In the tension tests, pressure was held at 2,887 psi while tension was increased. In the bending tests, pressure was held at 2,887 psi and tension at 145 kips while bending was increased. Strain gages were placed in the groove beneath the repair. The report states that results for Product B are not included: the manufacturer asked that they be withheld after uncured adhesive produced sub-standard performance.

## Key numbers

Pressure only. Unrepaired pipe burst at 3,694 psi. Product A burst at 6,921 psi, Product D at 7,641 psi. The results text lists Product C at 7,502 psi; Table 1 of the same report lists 7,592 psi. Failures of Products A, C, and D were in the steel away from the repaired region.

Tension, with pressure held at 2,887 psi. Unrepaired: 317 kips. Product A: 492 kips. Product C: 562 kips. Product D: 579 kips. On the Product D sample, the steel in the corroded region failed in tensile overload after the adhesive bond was exceeded.

Bending, reported as the bending force (and moment) at 0.20 percent strain in the steel. The unrepaired sample was bent without internal pressure, because the report states that failure would have occurred at a low bending load if it had been pressurized. Unrepaired: 30 kips (87.5 kip-feet). Product A: 26 kips (75.8 kip-feet). Product C: 70 kips (204.2 kip-feet). Product D: 40 kips (116.7 kip-feet). At a 40-kip bending load (116.7 kip-feet), hoop-direction strains in the steel under the repair were 4,130 microstrain for Product A, 2,150 for Product C, and 3,022 for Product D. Product C used carbon fiber with a large share of the fibers oriented axially.

## Takeaways

The reported burst and tension failures of the three documented repairs were in the steel, not as a rupture of the wrap itself. Product A’s bending force at 0.20 percent strain was below the unrepaired (unpressurized) sample. The report presents Table 1 as a comparison of those failure loads with the design loads above. Product B’s results were withheld as described in the setup.

[Download the report](/downloads/composite-repair-corroded-riser-pipe-2007.pdf). The same file is posted on [BSEE’s TAP-558 page](https://www.bsee.gov/research-record/tap-558-composite-repair-methods-steel-pipes).

## Sources

- [Composite Repair Methods for Steel Pipes, Research Activities Summary Report (TAP-558)](/downloads/composite-repair-corroded-riser-pipe-2007.pdf) — MMS / OTRC / Stress Engineering Services, June 2007
- [TAP-558 project page](https://www.bsee.gov/research-record/tap-558-composite-repair-methods-steel-pipes) — Bureau of Safety and Environmental Enforcement