Example: a corrosion dig on a gas transmission line
In short An invented walk-through of a metal-loss dig, used to show how a repair note can be structured. Not a real pipeline or a real event.
What this template is for
A repair case study on this site, when a real one is added later, should be able to point at a public document for every factual claim. This entry shows the headings. It uses round, assumed numbers and an invented line name so it cannot be confused with an NTSB report or a PHMSA incident. Real investigations belong in Lessons from public investigations. Public enforcement orders belong in Enforcement and incidents, with the order linked.
Assumed setting
Assume a 24-inch outside diameter, 0.375-inch wall, X52 gas transmission line in a Class 1 location, MAOP assumed at 1,000 psig. Assume an in-line inspection call of external metal loss, 0.150 inch deep and 6 inches long, in the pipe body, away from welds. Those inputs are the worked example on the calculator. They are reused here on purpose, so a reader can see the same arithmetic inside a narrative.
Questions the note should answer
- What was the threat, and what was it not? Body-wall metal loss, not a crack and not a gouge. The tool tolerance would be stated. In this example it is deliberately omitted, and the omission is a defect in the example, which is the point of showing it.
- Which criterion was used, and which regulation made it relevant? Original and modified B31G as screening methods named from §192.712. For these assumed inputs the original criterion is about 1,507 psig and the modified criterion about 1,565 psig, so the failure-pressure ratio against the assumed 1,000 psig MAOP is about 1.5. Depth is 40 percent of the wall, under the 80 percent immediate threshold. Whether that ratio is immediate, scheduled, or monitored depends on the class location and the lists in §192.714, which a real note would quote rather than round off.
- What was done to the steel? A real note names the repair from the methods section and says why the others were rejected. This example stops before pretending a crew chose one.
- What was done to the coating and the cathodic protection? Left blank here. A finished note cannot leave it blank. See the coating notes.
- What records were produced? Dimensions, method, material properties and whether they were traceable, verifier, and the pressure at the time of repair.
What a future real entry must not do
It must not invent a company, a county, a volume released, or a cost. If the event is real, it links the NTSB, PHMSA, or other public report and paraphrases. If the event is a teaching problem, it wears the example banner this page wears.
Sources
Related notes
- Screening calculators (Barlow, §192.105, B31G) — Assessment
- Corrosion metal loss — Defect assessment
- Dents — Defect assessment
- Choosing a repair — Repair methods
Also in Worked examples
Spotted an error? Engineers keep this site honest.Report an error or suggest a correction