Example: one corrosion profile through B31G, Modified B31G, and effective area

In short An invented river-bottom profile run through Original B31G, Modified B31G, and an RSTRENG-style effective-area search, showing how the choice of method can move the same anomaly across a §192.714 threshold.

Updated . Sources are listed at the end. Markdown version.

Why run all three

Section 192.712(b) lets a gas operator use ASME/ANSI B31G, R-STRENG, or an equally conservative alternative, and §195.587 names B31G and R-STRENG for liquid lines. The methods do not give the same answer. When the predicted failure pressure is close to a regulatory multiple of MAOP, the method choice decides which list the anomaly is on. The method descriptions are in ASME B31G, Modified B31G, and RSTRENG. This page only runs them.

Assumed inputs

  • 24-inch OD, 0.375-inch wall, Grade X52 (SMYS 52,000 psi), gas transmission.
  • Class 2 location, MAOP 975 psig. Hoop stress at MAOP is 975×24/(2×0.375)=31,200975 \times 24 / (2 \times 0.375) = 31{,}200 psi, 60% of SMYS.
  • External metal loss in the pipe body, away from welds and crossings, 12 inches long, measured at 1-inch stations:
Station (in) 0 1 2 3 4 5 6 7 8 9 10 11 12
Depth (in) 0 0.03 0.06 0.09 0.12 0.18 0.15 0.08 0.06 0.10 0.11 0.05 0

Maximum depth is 0.18 inch, 48% of the wall. That is below the 80% immediate trigger, so remaining strength decides the bucket.

Original B31G

Length 12 in, depth 0.18 in. z=L2/(Dt)=144/9=16z = L^2/(Dt) = 144/9 = 16, which is at or below 20, so the parabolic form applies. Flow stress is 1.1×1.1 \times SMYS =57,200= 57{,}200 psi. Folias factor M=1+0.8z=3.71M = \sqrt{1 + 0.8z} = 3.71. Area fraction A/A0=(2/3)(d/t)=0.32A/A_0 = (2/3)(d/t) = 0.32.

Pf=2 σf tD⋅1−A/A01−(A/A0)/M=1,787.5×0.680.914≈1,330 psigP_f = \frac{2\,\sigma_f\,t}{D}\cdot\frac{1 - A/A_0}{1 - (A/A_0)/M} = 1{,}787.5 \times \frac{0.68}{0.914} \approx 1{,}330 \text{ psig}

Ratio to MAOP: about 1.36.

Modified B31G

Same length and depth. Flow stress SMYS + 10,000 psi = 62,000 psi. Three-term Folias factor at z=16z = 16: M=1+0.6275z−0.003375z2=3.19M = \sqrt{1 + 0.6275z - 0.003375z^2} = 3.19. Area fraction 0.85×0.48=0.4080.85 \times 0.48 = 0.408.

Pf≈1,937.5×0.592/0.872≈1,315P_f \approx 1{,}937.5 \times 0.592 / 0.872 \approx 1{,}315 psig. Ratio: about 1.35.

Modified B31G comes out slightly lower than the original here. That is not an error. For a long, deep patch, the 0.85 rectangle removes more metal than the 2/3 parabola, and that outweighs the higher flow stress. Which single-depth method is lower depends on the length and depth of the patch, so neither should be assumed to bound the other.

Effective area (RSTRENG-style)

The effective-area method uses the measured profile. It tries every start and end station, takes the actual corroded area between them (trapezoids here), applies the Modified B31G flow stress and Folias factor to that length, and keeps the lowest result. For this profile, the governing window runs from station 2 to station 11:

  • Length 9 in, z=81/9=9z = 81/9 = 9, M=2.52M = 2.52.
  • Area 0.945 in² against an original area of 9×0.375=3.3759 \times 0.375 = 3.375 in², so A/A0=0.28A/A_0 = 0.28.
  • Pf≈1,937.5×0.72/0.889≈1,569P_f \approx 1{,}937.5 \times 0.72 / 0.889 \approx 1{,}569 psig. Ratio: about 1.61.

Software implementations of PR-3-805 also handle station spacing, interaction with neighbouring patches, and tool tolerance. This hand search does not, and a real assessment would.

What the numbers do to the schedule

In a Class 2 location, §192.714(d)(2)(iv) puts metal loss on the two-year list when predicted failure pressure is below 1.39 × MAOP. The single-depth methods put this anomaly at 1.35 to 1.36, inside the two-year list (inside an HCA, it would be on the one-year list in §192.933). The effective-area result, 1.61, is above the threshold, so remaining strength alone would not put it on the timed list.

Two things a real note would add before relying on the higher number:

  1. Tool tolerance. Section 192.712(e)(1) requires accounting for sizing uncertainty unless the dimensions were verified in the ditch. Adding a depth tolerance to every station lowers all three results, and the effective-area margin over 1.39 is not as large as it looks. See In-ditch examination.
  2. Growth to the next assessment. A ratio that clears the threshold today may not clear it at the next assessment date with a corrosion growth rate applied.

The arithmetic for the two closed forms is the same as the site calculator. The effective-area search needs a profile, which the calculator does not take.

Sources

  1. 49 CFR 192.712(b), corrosion metal loss analysis methods — eCFR
  2. 49 CFR 192.714(d), repair criteria outside HCAs — eCFR
  3. 49 CFR 195.587, methods for the strength of corroded pipe — eCFR
  4. Validity of standard defect-assessment methods (Kiefner & Associates, PHMSA-hosted PDF) — PHMSA
  5. Kiefner and Vieth, modified criterion, Oil & Gas Journal — Oil & Gas Journal