Burst test of a 24-inch leaking pipe with a Type B sleeve, 2019
A Type B sleeve on a 24-inch X65 pipe with through-holes failed at 2,578 psig, about 126 percent of SMYS.
Type B sleeve fit-up, tight and loose, 2021
On 24-inch pipe with a through-hole, a tight Type B sleeve leaked after 4,934 cycles and a loose sleeve after 1,382.
Backing-strip mill groove on a Type B sleeve, 2021
Two 12-inch Type B sleeves, one with a long-seam mill groove and one without, both reached 100,000 pressure cycles without a sleeve failure.
Full-scale testing of a compression sleeve, 2022
Three of four induction-installed compression sleeves reached 100,000 cycles and then burst in bare pipe outside the sleeve. One repaired sample failed at 8,858 cycles.
Manual pipe-jack torque test, 2019
Torque on a manual pipe jack versus chain load. About 686 ft-lbf reached the 33,400 lbf rated chain load.
Steel sleeves reinforcing corrosion and plain dents, 2021
Type B sleeves on 24-inch corrosion and dent samples raised the equivalent fatigue life relative to bare pipe. The report’s highlighted lives are its own conversion.
Composite repairs of corroded riser pipe under pressure, tension, and bending, 2007
On 8.625-inch X46 pipe with a 0.200-inch circumferential groove, unrepaired pipe burst at 3,694 psi. Three reported composite repairs burst between 6,921 and 7,641 psi, all in steel away from the repair.
Repair of dent-and-gouge damage by grinding and composite wraps, 2009
For a D/t of 50, curve fits in the article give average lives of 1,144 cycles for unrepaired dent-and-gouge damage, 6,710 cycles after grinding only, and 221,918 cycles after grinding plus a composite wrap, at a 50 percent MAOP pressure range.
Fatigue testing of composite repairs on dented pipe, 2010
Unrepaired 15 percent dents on 12.75-inch X42 pipe averaged 10,957 cycles at a 0-to-892 psi range. Two of eight composite systems reached a 250,000-cycle run-out with no failures in any of their repaired dents.
Fatigue and burst testing of composite and steel-sleeve repairs on corrosion and dents, 2014
On 75 percent corrosion, a composite repair leaked at 198,550 cycles and Type A and Type B sleeves reached a 302,465-cycle run-out. On 15 percent dents, the composite repair failed at 149,913 cycles and the sleeves reached 239,897 cycles without failure. All three corrosion burst samples failed in base pipe outside the repair, at 4,480, 4,233, and 4,290 psi.
Long-term subsea exposure testing of composite repairs, 2017
Fifteen underwater-installed composite repairs on 12.75-inch X42 pipe with 75 percent corrosion all held 10,000 hours at 72 percent of SMYS in simulated seawater. After ultraviolet exposure, thermal cycling, and pressure cycling, burst pressures were 1,681 psi unrepaired, 4,037 psi for Manufacturer B, and 3,615 psi for Manufacturer C.