In short What PHMSA’s 2 November 2022 FAQs say about when a gas or liquid repair may stay temporary, and when it has to be made permanent.

Updated . Sources are listed at the end. Markdown version.

PHMSA’s Office of Pipeline Safety issued Temporary Repair and Permanent Repair Frequently Asked Questions on 2 November 2022. The document says it is guidance. It is not a substantive rule, it does not create a new duty, and an operator who does something else still has to show that the regulations are met. The official page is PHMSA’s guidance entry. The point of the FAQs, in PHMSA’s own description of them, is that a temporary repair left in the ground as if it were permanent is an integrity problem.

Gas lines

Section 192.711 is the section the FAQs keep returning to. For pipe at or above 40 percent of SMYS, leaks, imperfections, and damage that impair serviceability are to be repaired permanently at discovery when that is feasible. When it is not feasible, the operator takes immediate temporary measures to protect the public, and replaces the temporary repair with a permanent one as soon as feasible. Non-integrity-management permanent repairs on gas gathering lines are also “as soon as feasible.”

Transmission pipe in a high consequence area, when the anomaly came from an integrity assessment, is under §192.933, not only under §192.711. The operator has to be able to show that the remediation makes the condition unlikely to threaten integrity until the next reassessment. The FAQ points at the immediate, one-year, and monitored lists in that section. A temporary repair does not stop that clock by being called a repair.

For onshore gas transmission that is not in an HCA and is not on an alternative MAOP, the FAQ says the regulations do not distinguish the method of a temporary repair from the method of a permanent one. What still differs is how long the repair is allowed to remain and whether a permanent repair was feasible at discovery.

The FAQ uses the incorporated edition of ASME B31.8S for the idea that if the time to failure is short compared with the scheduled repair, temporary measures are applied until the permanent repair is done. A temporary repair has a limited life. Leaving it in place without a date to replace it is the practice the FAQ is written against.

What “permanent” has to be able to show

The FAQs do not publish a catalog of approved fittings. They describe the difference as circumstance and duration. A permanent repair is the one the operator can defend, under the section that applies, as restoring the line for the period the rule requires. A temporary repair is the one used because that permanent repair could not be made yet, and it has to be replaced. Records have to show which one it is. A sleeve or a clamp with no note of why it was temporary, and no plan to remove or requalify it, is the gap these questions are aimed at.

Liquid lines are in the same document. Section 195.422 still requires a safe repair. The integrity-management schedules in §195.452 are not suspended because a fitting was installed quickly. Read the FAQ’s liquid questions against that section rather than against the gas paragraphs above.

Laboratory tests of particular sleeves are a different subject. They are summarized under test data, with the sponsor and the laboratory named. A burst test does not answer §192.711.

Sources

  1. PHMSA Temporary Repair and Permanent Repair FAQs, 2 November 2022 — PHMSA
  2. 49 CFR 192.711 — eCFR
  3. 49 CFR 192.933 — eCFR
  4. 49 CFR 195.422 — eCFR

Also in Regulations and official guidance

Spotted an error? Engineers keep this site honest.Report an error or suggest a correction