03 · Regulations and official guidance

CER Onshore Pipeline Regulations and pipeline repair

In short What the Canadian Energy Regulator Onshore Pipeline Regulations say that bears on repair: CSA Z662, maintenance welding, integrity management, defect records, and the operations and maintenance notification rules.

Updated . Sources are listed at the end. Markdown version.

The Canadian Energy Regulator Onshore Pipeline Regulations (OPR), registered as SOR/99-294, are made under the Canadian Energy Regulator Act. They apply to onshore pipelines under federal jurisdiction. The Justice Laws Website text was last modified on 16 November 2026 when this page was checked. The regulations are short and mostly set outcomes. The detail comes from CSA Z662, which the OPR incorporates, and from CER guidance notes that explain how the CER reads each section. The guidance notes say they are not a substitute for the regulations and that the legislation and standards prevail in any inconsistency.

Sections that bear on repair

Operating includes repairing (section 1). The definition of “operate” includes repair, maintain, deactivate, reactivate, and decommission. A requirement that a pipeline be operated in accordance with a standard therefore reaches repair work.

CSA Z662 and the OPR (section 4). A company must ensure a pipeline is designed, constructed, operated, or abandoned in accordance with the OPR and, for hydrocarbon pipelines, CSA Z662. It must also follow the company’s own programs, manuals, and procedures developed under the regulations. If the OPR and the standard are inconsistent, the OPR prevail.

Methods the standard does not cover (section 5.1). Designs, specifications, programs, procedures, and plans for which no standard is set out in the regulations must be submitted to the Commission for approval. The Commission approves one if it provides a level of safety at least equivalent to that generally provided by a comparable CSA standard or another applicable standard, or, where no comparable standard exists, a level that is adequate in the circumstances.

Maintenance welding (section 38). A company must not weld on a liquid-filled pipeline with a carbon equivalent of 0.50 percent or more unless it has shown that no other practical alternative is available. Such a weld is treated as a temporary installation and must be replaced with a permanent one as soon as practicable. To treat it as permanent, the company must submit welding specifications, procedures, and procedure qualification test results to the Commission for approval. The guidance notes explain the concern: delayed hydrogen cracking becomes more likely as carbon equivalent rises, and flowing liquid can quench a weld deposit on an in-service pipe. They refer companies to CSA Z662 for welding procedures and welder qualification for in-service welding.

Integrity management program (section 40). A company must develop, implement, and maintain a program that anticipates, prevents, manages, and mitigates conditions that could adversely affect safety or the environment during design, construction, operation, maintenance, or abandonment. The guidance notes describe the goal as pipelines that remain suitable for continued safe, reliable service, with hazard and consequence identification, evaluation and monitoring, mitigation, and record keeping. They say the program must be audited internally at intervals of no more than three years.

Defects and their records (section 41). If a company finds a level of defect in excess of that allowed by CSA Z662, it must document the particulars of the defect, its likely cause, and the corrective action taken or planned, and submit that documentation to the Regulator when required. The guidance notes list what repair records should include: the date, time, and location the defect was detected; the type of defect; how it was detected; the assessment methods; the repair methods and the reasons for them; and the date, time, and location of the repair. They add that manufacturing defects may be systemic and that the likelihood of recurrence should be considered.

Operations and maintenance without a new application

The CER’s operations and maintenance (O&M) guidance, updated to January 2025, sets out which work on an existing pipeline needs no application under the CER Act. Eligible O&M includes work needed to operate an existing pipeline safely, maintenance, upgrades or repairs that do not increase the approved maximum operating pressure, stress level, or diameter, and replacing up to 5 km of pipe where those values do not increase.

The guidance lists restrictions that require an application first. One bears directly on repair: welding on an in-service pipeline by a company that has not previously performed in-service welding in accordance with the in-service welding requirements of CSA Z662 (Clause 7.17 in the 2023 edition). Others include new pipeline construction, looping, aerial crossings, and deactivation for more than 12 months.

Some eligible work still requires notice to the CER at least 21 working days beforehand. The circumstances include exposing the pipe for integrity assessments or repairs where there are residences, or an institution where more than 50 people routinely gather, within the emergency planning zone or 200 m of the work; replacing more than 100 m but less than 5 km of pipe; pressure testing by means other than hydrostatic testing; and ground disturbance with power equipment within 30 m of a wetland or water body or on reserve, land claim settlement, or Métis settlement lands. For unplanned work that would normally require notice, the company must notify the CER as soon as it decides the work is necessary. Notifying the CER does not replace the duty to report incidents under the OPR and other legislation.

Status

The CER’s OPR page announces a comprehensive review of the regulations. The first engagement phase was in 2022, and a “What We Heard” report was released on 20 April 2023. The review may change the sections above, so check the current text. The guidance notes were last updated on 19 August 2021.

Advisories that sit alongside the OPR are on CER safety and information advisories. The provincial counterparts are in Alberta and British Columbia. For the U.S. repair-record rules that cover similar ground, see repair records.

Sources

  1. Canadian Energy Regulator Onshore Pipeline Regulations (SOR/99-294), full text — Justice Laws Website, Government of Canada
  2. Canadian Energy Regulator Onshore Pipeline Regulations (CER page) — Canada Energy Regulator
  3. Guidance Notes for the Canadian Energy Regulator Onshore Pipeline Regulations (updated 19 August 2021) — Canada Energy Regulator
  4. Operations and Maintenance Activities on Pipelines Regulated Under the Canadian Energy Regulator Act: Requirements and Guidance Notes (updated January 2025) — Canada Energy Regulator

Also in Regulations and official guidance

Spotted an error? Engineers keep this site honest.Report an error or suggest a correction

Open the form on this page

Occasional updates