Saskatchewan and Ontario: provincial pipeline requirements
In short How Saskatchewan's Pipelines Act, 1998, licensing regulations, and Directive PNG034 apply CSA Z662 to pipeline repair, and what Ontario's oil and gas pipeline systems regulation provides, with links to the official sources.
Pipelines that stay inside one province are regulated by that province, and the provinces differ in who the regulator is and how much of the technical content they take from CSA Z662. Alberta and British Columbia have their own pages. This page covers Saskatchewan and Ontario, the two other provinces whose official sources were read for this site. For the federal regulator, see CER Onshore Pipeline Regulations, and for the overall split see who regulates what in Canada.
Saskatchewan
The Government of Saskatchewan’s pipeline licensing page lists three documents as the legal authority to regulate design, construction, operation, discontinuation, and abandonment of oil, natural gas, and other pipelines in accordance with the latest edition of CSA Z662:
- The Pipelines Act, 1998.
- The Pipelines Administration and Licensing Regulations (PALR).
- Directive PNG034, Saskatchewan Pipelines Code.
Chapter 5 of PNG034 sets application requirements. The page also describes licensing through the province’s Integrated Resource Information System (IRIS), where applications are classed as routine or non-routine depending on whether risk rules are triggered, and a Pipeline Safety and Loss Management System Audit. The deadline to retroactively license designated pipelines passed on 20 January 2024, and the ministry says an unlicensed designated pipeline may be subject to administrative penalties.
Which edition of Z662 applies
Bulletin BT2023-009, issued 30 June 2023 by the Energy Regulation Division, records how Saskatchewan treats new editions. Under section 2.1 of PNG034, the minimum requirements for the design, construction, operation, modification, discontinuation, and abandonment of pipelines must be in accordance with the most recent published version of CSA Z662. When the ninth edition (Z662-23) was published on 30 June 2023, the Division said it intended to prohibit the safety-class system and the pressure-design approach introduced in Annex C, and would not enforce those elements. The bulletin names only those Annex C elements. See CSA Z662 for how the clauses are organized.
Ontario
Ontario Regulation 210/01, Oil and Gas Pipeline Systems, is made under the Technical Standards and Safety Act, 2000. It is the province’s licensing regulation for oil and gas pipeline systems. The e-Laws record checked for this page was current to 23 November 2026. Section 18(6) provides that an inspector may inspect the installations and repairs performed by or on behalf of a licence applicant or holder, and the workmanship relating to them, to determine whether they comply with the Regulation, so repair work is within the scope of provincial inspection. The Regulation defines an “Oil and Gas Pipeline Systems Code Adoption Document,” adopted under Ontario Regulation 223/01, and uses a list of authorized standards; consult those documents for the editions in force, because this page does not summarize them.
Other provinces
Other provinces have their own pipeline statutes and regulators, and this site adds a page for a province only after reading its official source. Until then, the federal and provincial split on the overview page shows where to start, and the regulator’s own website is the place to confirm the current edition of any rule.
Sources
- Pipeline Licensing — Government of Saskatchewan
- Bulletin BT2023-009, CSA Z662-23 in effect (30 June 2023) — Saskatchewan Ministry of Energy and Resources, Energy Regulation Division
- Ontario Regulation 210/01, Oil and Gas Pipeline Systems — Government of Ontario, e-Laws
Related notes
- CSA Z662: Canada's oil and gas pipeline systems standard — Codes and standards
- Choosing a repair — Repair methods
- How codes and regulations differ — Codes and standards
- Corrosion metal loss — Defect assessment
- Type A sleeve leak on the Twin Oaks Pipeline, Upper Makefield Township, Pennsylvania — Case studies
Also in Regulations and official guidance
- How to read PHMSA sources
- Part 192 repair and integrity duties
- Part 195 repair and integrity duties
- Gas transmission rule updates
- Official repair guidance
- Advisory bulletins that bear on repair
- Interpretations and FAQs
- PHMSA research on repair methods
- Lessons from public investigations
- Repair records for sleeves and other repairs
- Temporary and permanent repairs
- AB-539: engineered composite alterations in Alberta
- Repair schedules: gas transmission versus hazardous liquid
- Pipeline regulation in Canada: who regulates what
- CER Onshore Pipeline Regulations and pipeline repair
- CER safety and information advisories that bear on repair
- Alberta: Pipeline Act, Pipeline Rules, and AER Directive 077
- British Columbia: Pipeline Regulation and BC Energy Regulator requirements
- TSB pipeline investigation reports: what Canada's safety board publishes
Spotted an error? Engineers keep this site honest.Report an error or suggest a correction