In short Jet-fuel leak in 2025 under a 1995 Type A sleeve on the Twin Oaks Pipeline, caused by water ingress and near-neutral stress-corrosion cracking.

Updated . Sources are listed at the end. Markdown version.

Source: Pipeline and Hazardous Materials Safety Administration (PHMSA) (2025). Account type: Independent regulatory record.

On 31 January 2025 a jet-fuel leak was found on Energy Transfer/Sunoco’s Twin Oaks Pipeline in Upper Makefield Township, Pennsylvania. The leak came from under a Type A sleeve installed in 1995 over a bottom-side dent. Metallurgical work found a 2.5-inch axial crack caused by near-neutral stress-corrosion cracking after water entered the space between the pipe and the sleeve. PHMSA later issued Advisory Bulletin ADB-2026-02 on Type A sleeve risks (moisture intrusion, cathodic-protection shielding, and pressure-cycle fatigue) and, in a May 2025 consent order, required a system-wide Type A sleeve review and a continued 20 percent pressure reduction.

Method

Type A steel reinforcement sleeve (failed in service). Subsequent integrity work required under a PHMSA consent order, including evaluation or removal of other Type A sleeves on the 105-mile system.

Defect

Bottom-side dent originally repaired in 1995; later 2.5-inch axial crack from near-neutral stress-corrosion cracking after water entered the annulus between the carrier pipe and the sleeve

Pipe

Twin Oaks Pipeline, jet fuel service. Pipe size and grade not stated in the advisory. A 20 percent operating-pressure reduction was required after the leak and could not be lifted without PHMSA written approval.

Outcome

Jet fuel released from under the 1995 Type A sleeve. PHMSA’s advisory cites water ingress and NN-SCC as the crack mechanism. Sunoco was required to verify every Type A sleeve on the system, justify any that remain, improve leak detection, complete metallurgical testing and a root-cause analysis, and keep the pressure reduction in place pending approval.

This account is taken from a public regulatory or investigative record.

Dates: Release discovered 31 January 2025. PHMSA issued ADB-2026-02 on 26 January 2026 (published in the Federal Register 28 January 2026). A consent order with Sunoco Pipeline, L.P. was executed 2 May 2025.

Maker named in the source: Sleeve manufacturer not named.

Sources

  1. Type A sleeve leak on the Twin Oaks Pipeline, Upper Makefield Township, Pennsylvania — Pipeline and Hazardous Materials Safety Administration (PHMSA)
  2. Related public record — Pipeline and Hazardous Materials Safety Administration (PHMSA)
  3. Related public record — Pipeline and Hazardous Materials Safety Administration (PHMSA)

Also in Case studies