07 · Case studies

Type B sleeves replacing mechanical clamps at a Texas refinery

In short A refinery ordered steel sleeves to replace mechanical clamps that had to come off at every shutdown. The operator is not named.

Updated . Sources are listed at the end. Markdown version.

Source: Allan Edwards field account (Word draft; no downloadable PDF).

A Texas refinery, operator not named, had mechanical clamps in high-temperature service. Hot work was often restricted. After a review of where welding could be done, the operator ordered steel repair sleeves to replace clamps that otherwise had to be removed and replaced at every routine shutdown.

The account claims a 95 percent cost reduction on the first order and later repeat orders. That percentage is the vendor’s claim. Pipe size, the number of sleeves, and the dates are not given.

Sources

  1. Allan Edwards field account (Word draft; no PDF is posted) — Allan Edwards

Also in Case studies

Spotted an error? Engineers keep this site honest.Report an error or suggest a correction

Open the form on this page

Occasional updates