07 · Case studies
Line-plug train isolation and diversion of two 24-inch gas transmission lines under a planned Singapore subway station
In short Three simultaneous double line-plug train isolations with 24-inch bypasses to divert twin 40-bar gas lines under a Singapore subway site.
Source: T.D. Williamson (2025). Account type: Vendor account.
Two 24-inch, 40-bar gas transmission lines in Singapore ran directly under a planned subway station, in a tight site beside a busy intersection and an elevated highway. The operator had to divert both lines without cutting off supply. TDW installed six 24-inch LOCK-O-RING Plus fittings and carried out three double line-plug train isolations at once, each with a 24-inch bypass, working around the clock. The vendor says the move was finished on schedule with no market outage, and that gas that would have been blown down was captured. This is a construction isolation rather than an anomaly repair, but it is a detailed public example of urban double-block isolation.
Method
Three simultaneous double line-plug train isolations with 24-inch LOCK-O-RING Plus fittings, hot taps, and dedicated 24-inch bypasses, so both lines could be diverted without blowing down
Defect
Not a defect repair. Planned relocation of two live transmission lines that ran under a future subway station in a congested urban site.
Pipe
Two 24-inch natural-gas transmission pipelines, 40 bar (600 psi), Singapore, next to a major intersection, an elevated highway, and a checkpoint.
Outcome
TDW reports the diversions were completed on time with no interruption of gas supply. The company also estimates that capturing 4,694 MSCF of gas avoided venting the equivalent of 2,938 tons of CO2. Those figures are the vendor’s.
Schedule, cost, and service-life figures in this note are the publisher’s claims. They were not checked against an operator record or a laboratory report.
Dates: Case-study page uses 2025 photo assets; the exact job date is not stated.
Maker named in the source: T.D. Williamson. The source uses the vendor’s trademarked name STOPPLE® for its line-plugging equipment.
Sources
Related notes
- Hot tapping and line plugging — Repair methods
- In-service welding and hydrogen pipelines — Repair methods
- Cut-out and replacement — Repair methods
- ASME B31.8 and B31.8S — Codes and standards
- Part 192 repair and integrity duties — Regulations and official guidance
- Choosing a repair — Repair methods
Also in Case studies
- Type A sleeve leak on the Twin Oaks Pipeline, Upper Makefield Township, Pennsylvania
- Type B sleeve leak on the Marysville-Toledo Crude Pipeline, Sterling Heights, Michigan (CAO 4-2026-025)
- Type A sleeve leak on Colonial Line 1, Huntersville, North Carolina (CPF 2-2021-005-NOPSO)
- Type A sleeve leak on Colonial Line, Gwinnett County (Harbins Road), Georgia
- Type A sleeve leak on the CNG/Plantation pipeline, Belton, South Carolina
- Type C compression-sleeve repairs on the Oasis Pipeline, Texas
- In-service X70 Type B sleeve installation on West-East Gas Pipeline Line 3, China
- Subsea Clamp+Sleeve repair of a buckled 10-inch crude line, South Marsh Island Block 59
- ROV-installed Flange Repair Split+Sleeve on a 10-inch water-injection line, offshore Angola
- ROV-installed leak-sealing clamp on a 10-inch water-injection riser flange, Foinaven field
- Emergency leak repair on a 30-inch onshore pipeline with a bolt-on fitting
- Composite sleeve repair of 900 feet of cooling-tower corrosion on a U.S. refinery pipeline
- Composite sleeve repair of a dent and seam-weld crack on a 24-inch crude-oil pipeline
- Underwater composite sleeve repair of girth-weld corrosion on a 12-inch gas pipeline
- Composite sleeve repair of a rockfall dent on a 36-inch hydroelectric pipeline in the French Alps
- Burst test of a composite sleeve repair recovered after 25 years in service (installed 1995)
- Composite pipe-wrap repairs of corrosion on Equistar Pipeline, Texas
- Weld-wrap composite reinforcement of an internal weld defect on a 24-inch products pipeline, Western Europe
- Composite repair of a 32-inch offshore riser, Thailand
- Splash-zone composite repair of mechanical damage on a 12-inch subsea crude line, Gulf of Mexico
- Carbon-fiber repair of a deep crack on a 900 mm gas-transmission bend
- Epoxy-filled sleeve encapsulation of a large dent on a 14-inch trunkline, Papua New Guinea
- High-pressure line-plug isolation to remove a stuck pig and replace a leaking valve on a CO2 pipeline
- Line-plug train isolation to decommission a gas-processing plant off a 36-inch transmission line, Alabama
- Emergency double line-plug isolation of a burning 14-inch NGL pipeline after a third-party strike, West Texas
- 12-inch double line-plug isolation with bypass for a live gas-line repair, Oklahoma
- Line stop to connect 8-inch PE gas mains, St. Louis
- Insertion valves and line stops after a sheared 8-inch valve, Covington, Ohio
- Epoxy recoating of HDD-damaged girth and spiral welds, Kansas
- West Virginia 30-inch leak at a previous composite wrap
- Port Allen valve-station dent reinforced with an E-glass wrap
- 14-inch diesel line at Redding, Pennsylvania, carbon wrap
- Hinged protective tools on a 24-inch Florida line during bridge work
- Custom Type B sleeve around an existing clamp, Florida
- Type B sleeves replacing mechanical clamps at a Texas refinery
- Double-hump girth-weld sleeve on a 26-inch Kentucky gas line
- Compression sleeve on a crude line, Middle East operator
Spotted an error? Engineers keep this site honest.Report an error or suggest a correction