When an in-line gas plant in Alabama was taken out of service, it was still tied into a 36-inch, 400-mile transmission line that fed much of southern Florida. The operator wanted a tight-site isolation, as few permanent fittings as possible, and no outage. Standard line-plug train heads were not made for the line’s 0.875-inch wall, so TDW redesigned and tested the tool, then set a double-block-and-bleed isolation at 60 bar with a bypass through the housing. The vendor says the tools set on the first try and stayed in place for ten days while the plant was demolished, with no blown product and no customer outage.

Method

Modified line-plug train (two plugging heads through one fitting) with bypass through the housing, designed to seal against a 0.875-inch pipe wall, then 36-inch LOCK-O-RING Plus completion plugs

Defect

Not a defect repair. Isolation of an obsolete processing-plant branch so it could be torn down while a 400-mile transmission line continued to supply Florida markets.

Pipe

36-inch natural-gas transmission line, 0.875-inch wall, isolated against 60 bar (875 psi). Alabama, connected to a roughly 400-mile line serving southern Florida.

Outcome

TDW reports the isolation was set on the first attempt, held for ten days with no product at the bleed port, and that customer supply was not interrupted. After the plant was disconnected, two 36-inch completion plugs were left in the fittings.

Schedule, cost, and service-life figures in this note are the publisher’s claims. They were not checked against an operator record or a laboratory report.

Dates: Case-study PDF is copyright 2019. The plant dates from the late 1990s; the exact isolation date is not stated.

Maker named in the source: T.D. Williamson. The source uses the vendor’s trademarked name STOPPLE® for its line-plugging equipment.

Sources

  1. STOPPLE® Train isolation to decommission a gas-processing plant off a 36-inch transmission line, Alabama — T.D. Williamson

Also in Case studies

Spotted an error? Engineers keep this site honest.Report an error or suggest a correction

Open the form on this page

Occasional updates