07 · Case studies

Type B sleeve leak on the Marysville-Toledo Crude Pipeline, Sterling Heights, Michigan (CAO 4-2026-025)

In short Crude oil leak in 2026 from two holes in a 2010 Type B sleeve seam weld on the 16-inch Marysville-Toledo pipeline, leading to CAO 4-2026-025.

Updated . Sources are listed at the end. Markdown version.

Source: PHMSA, Office of Pipeline Safety (2026). Account type: Independent regulatory record.

A member of the public reported crude oil seeping from the ground in Sterling Heights, Michigan, on 18 September 2026. After excavation, Energy Transfer confirmed the source was a Type B sleeve installed in 2010 on the 16-inch X52 Marysville-Toledo Crude Pipeline. Oil was leaking through two holes in the sleeve’s longitudinal weld, then traveling along an uncoated sleeve inside a 20-inch cased, concrete-coated crossing. The operator could not find the original repair records for that sleeve or for 11 other sleeves on the same line. PHMSA issued Corrective Action Order CPF 4-2026-025 and the company prepared to cut out the failed sleeve and install pretested pipe.

Method

Type B pressure-containing steel sleeve (failed in service). Operator planned to remove the failed sleeve and replace the pipe with pretested pipe (cut-out).

Defect

Failure of the repair itself: two holes in the longitudinal weld of the Type B sleeve. The original defect under the sleeve is unknown because installation records could not be located.

Pipe

Marysville-Toledo Crude (MTC) Pipeline, about 130 miles of 16-inch, 0.281-inch wall, Grade X52, coal-tar coated pipe, in a 20-inch steel casing with concrete coating at the failure site. Crude oil service. Operating pressure at the time of failure was not stated in the order.

Outcome

At least 15 barrels of crude oil were recovered from the site and a nearby storm drain, in a high-consequence area. The line was shut in. The sleeve, installed in 2010, was uncoated and sat in a cut-out of the casing; oil ran down the casing. Energy Transfer lacked original records for this sleeve and for 11 other sleeves on the MTC line, and PHMSA ordered a broader sleeve inventory and integrity plan, plus independent mechanical/metallurgical testing and a separate root-cause analysis.

This account is taken from a public regulatory or investigative record.

Dates: Release reported 18 September 2026; source confirmed 19 September 2026; Corrective Action Order issued 21 September 2026.

Maker named in the source: Sleeve manufacturer not named.

Sources

  1. Type B sleeve leak on the Marysville-Toledo Crude Pipeline, Sterling Heights, Michigan (CAO 4-2026-025) — PHMSA, Office of Pipeline Safety

Also in Case studies

Spotted an error? Engineers keep this site honest.Report an error or suggest a correction

Open the form on this page

Occasional updates