Carbon-fiber repair of a deep crack on a 900 mm gas-transmission bend
In short Nine-ply carbon-fiber composite reinforcement of an 80 percent through-wall longitudinal crack on a 900 mm gas-transmission bend.
Source: CSNRI / Critica Infrastructure (DiamondWrap), installed by SEPS. Account type: Vendor account.
An operator found a 25 mm longitudinal crack, 80 percent through-wall, on a bend of a 900 mm gas line running at 64 bar and under significant loading. The company wanted to avoid hot work and, if possible, a shutdown. CSNRI specified a nine-ply carbon-fiber kit. After the pipe was uncovered and blasted, four SEPS technicians applied filler, primer, and the wrap, and the vendor says they finished in less than four hours with the line still in service. Using carbon fiber rather than a pre-cured composite coil makes this a useful second CSNRI product example, still clearly a marketing case study.
Method
DiamondWrap HP Standard 9-ply carbon-fiber composite wrap (Weld Special Build kit), 30 linear cm, over filler and primer, no hot work
Defect
25 mm (0.98 inch) longitudinal crack on a bend, said to have penetrated 80 percent of the wall
Pipe
900 mm (35.4 inch) diameter carbon-steel gas transmission line, 14.5 mm (0.57 inch) original wall, 64 bar (928 psi) operating pressure, 6 C operating temperature. Grade not stated.
Outcome
CSNRI reports four local technicians finished the wrap in less than four hours, with the line and nearby equipment remaining in service, and says the repair was done within six days of discovery at about one-tenth the cost of a traditional repair. Cost and schedule claims are the vendor’s.
Schedule, cost, and service-life figures in this note are the publisher’s claims. They were not checked against an operator record or a laboratory report.
Dates: Year not stated.
Maker named in the source: CSNRI (DiamondWrap).
Sources
- DiamondWrap carbon-fiber repair of a deep crack on a 900 mm gas-transmission bend — CSNRI / Critica Infrastructure (DiamondWrap), installed by SEPS
Related notes
- Composite wraps — Repair methods
- ASME PCC-2 — Codes and standards
- ISO 24817 — Codes and standards
- Corrosion metal loss — Defect assessment
- AB-539: engineered composite alterations in Alberta — Regulations and official guidance
- Choosing a repair — Repair methods
Also in Case studies
- Type A sleeve leak on the Twin Oaks Pipeline, Upper Makefield Township, Pennsylvania
- Type B sleeve leak on the Marysville-Toledo Crude Pipeline, Sterling Heights, Michigan (CAO 4-2026-025)
- Type A sleeve leak on Colonial Line 1, Huntersville, North Carolina (CPF 2-2021-005-NOPSO)
- Type A sleeve leak on Colonial Line, Gwinnett County (Harbins Road), Georgia
- Type A sleeve leak on the CNG/Plantation pipeline, Belton, South Carolina
- Type C compression-sleeve repairs on the Oasis Pipeline, Texas
- In-service X70 Type B sleeve installation on West-East Gas Pipeline Line 3, China
- Subsea Clamp+Sleeve repair of a buckled 10-inch crude line, South Marsh Island Block 59
- ROV-installed Flange Repair Split+Sleeve on a 10-inch water-injection line, offshore Angola
- ROV-installed leak-sealing clamp on a 10-inch water-injection riser flange, Foinaven field
- Emergency leak repair on a 30-inch onshore pipeline with a bolt-on fitting
- Composite sleeve repair of 900 feet of cooling-tower corrosion on a U.S. refinery pipeline
- Composite sleeve repair of a dent and seam-weld crack on a 24-inch crude-oil pipeline
- Underwater composite sleeve repair of girth-weld corrosion on a 12-inch gas pipeline
- Composite sleeve repair of a rockfall dent on a 36-inch hydroelectric pipeline in the French Alps
- Burst test of a composite sleeve repair recovered after 25 years in service (installed 1995)
- Composite pipe-wrap repairs of corrosion on Equistar Pipeline, Texas
- Weld-wrap composite reinforcement of an internal weld defect on a 24-inch products pipeline, Western Europe
- Composite repair of a 32-inch offshore riser, Thailand
- Splash-zone composite repair of mechanical damage on a 12-inch subsea crude line, Gulf of Mexico
- Epoxy-filled sleeve encapsulation of a large dent on a 14-inch trunkline, Papua New Guinea
- High-pressure line-plug isolation to remove a stuck pig and replace a leaking valve on a CO2 pipeline
- Line-plug train isolation and diversion of two 24-inch gas transmission lines under a planned Singapore subway station
- Line-plug train isolation to decommission a gas-processing plant off a 36-inch transmission line, Alabama
- Emergency double line-plug isolation of a burning 14-inch NGL pipeline after a third-party strike, West Texas
- 12-inch double line-plug isolation with bypass for a live gas-line repair, Oklahoma
- Line stop to connect 8-inch PE gas mains, St. Louis
- Insertion valves and line stops after a sheared 8-inch valve, Covington, Ohio
- Epoxy recoating of HDD-damaged girth and spiral welds, Kansas
- West Virginia 30-inch leak at a previous composite wrap
- Port Allen valve-station dent reinforced with an E-glass wrap
- 14-inch diesel line at Redding, Pennsylvania, carbon wrap
- Hinged protective tools on a 24-inch Florida line during bridge work
- Custom Type B sleeve around an existing clamp, Florida
- Type B sleeves replacing mechanical clamps at a Texas refinery
- Double-hump girth-weld sleeve on a 26-inch Kentucky gas line
- Compression sleeve on a crude line, Middle East operator
Spotted an error? Engineers keep this site honest.Report an error or suggest a correction