ROV-installed Flange Repair Split+Sleeve on a 10-inch water-injection line, offshore Angola

In short ROV-installed Split+Sleeve enclosure built from subsea photogrammetry to seal a leaking 900-pound flange 80 meters deep off Angola.

Updated . Sources are listed at the end. Markdown version.

Source: PLIDCO, with field execution by Film-Ocean / Stapem Offshore; also written up by distributor Rice Resource Technologies (2025). Account type: Vendor account.

A leak on a 10-inch water-injection line off Angola, at a damaged 900-pound flange 80 metres down, stopped injection to an offshore platform. Divers could not be used, so Film-Ocean captured photogrammetry and PLIDCO built a Flange Repair Split+Sleeve for ROV installation, with corrosion-resistant finishes and anodes. After the clamp was set, it was hydrotested for eight hours with no reported leak, and the line was returned to service. The same job is described on PLIDCO’s Split+Sleeve page, in a 2025 LinkedIn post, and in a longer distributor write-up.

Method

Custom PLIDCO Flange Repair Split+Sleeve, designed from 3D photogrammetry, installed by observation-class ROV with a buoyancy package. No welding. Eight-hour hydrostatic test after installation.

Defect

Leaking / compromised 900-pound flange assembly on a branch of a water-injection line

Pipe

10-inch water-injection line, 900-pound flange, 80 metres (262 feet) water depth, offshore Angola. Line was shut down before the repair. Design standard cited: ASME Section VIII Division 2.

Outcome

The clamp passed an eight-hour hydrostatic test with no reported pressure loss or leakage, and injection was restored without diver intervention, according to PLIDCO and its distributor.

Schedule, cost, and service-life figures in this note are the publisher’s claims. They were not checked against an operator record or a laboratory report.

Dates: Year of the repair is not stated on the product page. PLIDCO and Rice Resource posted the case in 2025.

Maker named in the source: PLIDCO.

Sources

  1. ROV-installed Flange Repair Split+Sleeve on a 10-inch water-injection line, offshore Angola — PLIDCO, with field execution by Film-Ocean / Stapem Offshore; also written up by distributor Rice Resource Technologies
  2. Related public record — PLIDCO, with field execution by Film-Ocean / Stapem Offshore; also written up by distributor Rice Resource Technologies
  3. Related public record — PLIDCO, with field execution by Film-Ocean / Stapem Offshore; also written up by distributor Rice Resource Technologies