07 · Case studies

Hinged protective tools on a 24-inch Florida line during bridge work

In short Hinged protection tools placed on an above-ground 24-inch line while concrete bridge supports were replaced, then removed. Not a pressure-containing repair.

Updated . Sources are listed at the end. Markdown version.

Source: Allan Edwards field account (year not stated in the account).

A 24-inch above-ground pipeline in Florida runs parallel to a bridge. During replacement of the concrete supports, five hinged Safety Clam tools were placed on the exposed pipe and later removed and stored. The account says the tools were manufactured and shipped within a week of the inquiry and that the bridge work was not held up.

This is mechanical protection against a construction strike. It is not a sleeve, a clamp repair of a defect, or a pressure-containing repair. The schedule is the publisher’s.

Sources

  1. Allan Edwards field account, Safety Clam tools on a Florida bridge crossing — Allan Edwards

Also in Case studies

Spotted an error? Engineers keep this site honest.Report an error or suggest a correction

Open the form on this page

Occasional updates