In short Woven-fiberglass epoxy composite repair of severe external corrosion under wet tape on a Texas pipeline in brine-saturated soil.

Updated . Sources are listed at the end. Markdown version.

Source: Pipeline & Gas Journal (February 2001), quoting Equistar Pipeline corrosion engineers; archived at The Free Library (2001). Account type: Trade press.

Around 1999, Equistar Pipeline stripped wet cold-applied tape from pipe sitting in brine at Mont Belvieu, Texas, and found up to 100 mils of corrosion, with half-inch wall down to a quarter-inch in places. Engineers wrapped the pipe with Armor Plate, a woven-fiberglass epoxy composite, and the company’s corrosion engineer told Pipeline & Gas Journal that the line was returned to its original pressure rating without being depressurized. The same article describes a later 40-percent wall-loss repair under a highway right-of-way in southeast Houston and a wet barrier-coating use in a creek. The piece is promotional in tone, but it records a named operator describing field use of a non-Clock-Spring composite system.

Method

Armor Plate Pipe Wrap: woven fiberglass cloth saturated with epoxy, wrapped in multiple layers, cured ambient or with a heat blanket

Defect

At Mont Belvieu, up to 100 mils of circumferential corrosion under moisture-soaked tape in brine, with half-inch wall reduced to a quarter-inch in places. At a southeast Houston highway right-of-way, pitting with about 40 percent wall loss. A third site used the wrap as a barrier coating on pipe under an active creek.

Pipe

Equistar Pipeline sites at Mont Belvieu and Alvin / southeast Houston, Texas. Nominal diameter and grade are not stated. The Mont Belvieu pipe is described as originally half-inch wall.

Outcome

Equistar’s senior corrosion engineer is quoted as saying Armor Plate restored the pipe to its original pressure rating and was used as a permanent repair, applied without depressurizing the line. These are contemporaneous operator comments in a trade magazine, not a laboratory report.

This account is taken from a public regulatory or investigative record.

Dates: Article dated 1 February 2001, describing work from about 1999-2000.

Maker named in the source: Armor Plate (Wil-Cor).

Sources

  1. Cynthia Greenwood, Composite Pipe Repair Method Shows Versatility, Long-Lasting, Pipeline & Gas Journal, February 2001 — Pipeline & Gas Journal, quoting Equistar Pipeline corrosion engineers