Emergency double line-plug isolation of a burning 14-inch NGL pipeline after a third-party strike, West Texas

In short Emergency hot tap and double line-plug isolation to extinguish and isolate a burning 14-inch NGL pipeline after a third-party strike.

Updated . Sources are listed at the end. Markdown version.

Source: T.D. Williamson (8 October 2020 media release) (2020). Account type: Vendor account.

In West Texas a third-party contractor hit a 14-inch NGL line, causing an explosion and a fire with flames reported at 300 feet. Four people were injured, one critically. The operator rerouted product at a much lower rate, and TDW mobilized a large hot-tap crew. Technicians performed a double line-plug isolation; sweeping the tap holes caused the fire to bellow until the heads were fully set, which then cut off the vapor feeding the fire. TDW says the isolation allowed the damaged section to be repaired without a full system shutdown. This is a company press release, not an accident investigation.

Method

Double line-plug hot-tap and plug isolation on a live, burning line, after product was rerouted at a reduced flow rate, so the damaged section could be isolated and repaired while the system stayed in service

Defect

Third-party excavation strike, rupture, and fire

Pipe

14-inch natural-gas-liquids pipeline, West Texas. Operating pressure at the time of the strike is not stated. Responding firefighters recorded temperatures above 1,500 F, and flames were described as 300 feet high.

Outcome

TDW reports that eight hot-tap technicians mobilized from several service centers, a double line-plug was set, and once the heads sealed they starved the fire of NGL vapors so it went out. The company says fittings left the shop in less than six hours and the field problem was solved in less than a day on site. A separate 2019 TDW PDF describes a similar 20-inch NGL trencher-strike fire; the two accounts differ in diameter and some details and should not be assumed to be the same job.

Schedule, cost, and service-life figures in this note are the publisher’s claims. They were not checked against an operator record or a laboratory report.

Dates: Press release dated 8 October 2020.

Maker named in the source: T.D. Williamson. The source uses the vendor’s trademarked name STOPPLE® for its line-plugging equipment.

Sources

  1. Emergency double STOPPLE® isolation of a burning 14-inch NGL pipeline after a third-party strike, West Texas — T.D. Williamson (8 October 2020 media release)

Also in Case studies

Spotted an error? Engineers keep this site honest.Report an error or suggest a correction

Open the form on this page

Occasional updates