07 · Case studies
Composite sleeve repair of a rockfall dent on a 36-inch hydroelectric pipeline in the French Alps
In short Helicopter-mobilized pre-cured composite reinforcement for cyclic fatigue on a rockfall-dented 36-inch X60 penstock in the French Alps.
Source: CSNRI / Critica Infrastructure (Clock Spring). Account type: Vendor account.
A landslide in the French Alps dented a 36-inch X60 hydroelectric pipeline (30 mm wall, 70 bar design) at a site that took more than an hour to reach on foot. The owner wanted a repair that could be done with little equipment, would address cyclic fatigue of the dent, and would not take the line out of service. A CSNRI crew and materials were flown in by helicopter, the area was blasted to Sa 2.5 and checked for cracks, the dent was filled, and four 36-inch pre-cured composite sleeves were installed over two days. The account is a vendor case study, but the site constraints and pipe data are specific.
Method
Dent filled with incompressible filler (23 packs of MA441 in two single-wrap molds), then four 36-inch Clock Spring composite sleeves
Defect
Dent caused by falling rock / landslide (ground movement). No crack-like features were found after inspection.
Pipe
36-inch (914 mm) API 5L X60 hydroelectric pipeline, 30 mm (1.18 inch) original wall, 70 bar (1,015 psi) design pressure. Remote site in the French Alps, reachable by a 75-minute walk or by helicopter.
Outcome
CSNRI reports equipment and crew were flown in by helicopter, the repair was completed in two days, and the line was not taken out of service.
Schedule, cost, and service-life figures in this note are the publisher’s claims. They were not checked against an operator record or a laboratory report.
Dates: Year not stated.
Maker named in the source: CSNRI (Clock Spring).
Sources
- Clock Spring repair of a rockfall dent on a 36-inch hydroelectric pipeline in the French Alps — CSNRI / Critica Infrastructure (Clock Spring)
Related notes
- Composite wraps — Repair methods
- ASME PCC-2 — Codes and standards
- ISO 24817 — Codes and standards
- Corrosion metal loss — Defect assessment
- AB-539: engineered composite alterations in Alberta — Regulations and official guidance
- Choosing a repair — Repair methods
Also in Case studies
- Type A sleeve leak on the Twin Oaks Pipeline, Upper Makefield Township, Pennsylvania
- Type B sleeve leak on the Marysville-Toledo Crude Pipeline, Sterling Heights, Michigan (CAO 4-2026-025)
- Type A sleeve leak on Colonial Line 1, Huntersville, North Carolina (CPF 2-2021-005-NOPSO)
- Type A sleeve leak on Colonial Line, Gwinnett County (Harbins Road), Georgia
- Type A sleeve leak on the CNG/Plantation pipeline, Belton, South Carolina
- Type C compression-sleeve repairs on the Oasis Pipeline, Texas
- In-service X70 Type B sleeve installation on West-East Gas Pipeline Line 3, China
- Subsea Clamp+Sleeve repair of a buckled 10-inch crude line, South Marsh Island Block 59
- ROV-installed Flange Repair Split+Sleeve on a 10-inch water-injection line, offshore Angola
- ROV-installed leak-sealing clamp on a 10-inch water-injection riser flange, Foinaven field
- Emergency leak repair on a 30-inch onshore pipeline with a bolt-on fitting
- Composite sleeve repair of 900 feet of cooling-tower corrosion on a U.S. refinery pipeline
- Composite sleeve repair of a dent and seam-weld crack on a 24-inch crude-oil pipeline
- Underwater composite sleeve repair of girth-weld corrosion on a 12-inch gas pipeline
- Burst test of a composite sleeve repair recovered after 25 years in service (installed 1995)
- Composite pipe-wrap repairs of corrosion on Equistar Pipeline, Texas
- Weld-wrap composite reinforcement of an internal weld defect on a 24-inch products pipeline, Western Europe
- Composite repair of a 32-inch offshore riser, Thailand
- Splash-zone composite repair of mechanical damage on a 12-inch subsea crude line, Gulf of Mexico
- Carbon-fiber repair of a deep crack on a 900 mm gas-transmission bend
- Epoxy-filled sleeve encapsulation of a large dent on a 14-inch trunkline, Papua New Guinea
- High-pressure line-plug isolation to remove a stuck pig and replace a leaking valve on a CO2 pipeline
- Line-plug train isolation and diversion of two 24-inch gas transmission lines under a planned Singapore subway station
- Line-plug train isolation to decommission a gas-processing plant off a 36-inch transmission line, Alabama
- Emergency double line-plug isolation of a burning 14-inch NGL pipeline after a third-party strike, West Texas
- 12-inch double line-plug isolation with bypass for a live gas-line repair, Oklahoma
- Line stop to connect 8-inch PE gas mains, St. Louis
- Insertion valves and line stops after a sheared 8-inch valve, Covington, Ohio
- Epoxy recoating of HDD-damaged girth and spiral welds, Kansas
- West Virginia 30-inch leak at a previous composite wrap
- Port Allen valve-station dent reinforced with an E-glass wrap
- 14-inch diesel line at Redding, Pennsylvania, carbon wrap
- Hinged protective tools on a 24-inch Florida line during bridge work
- Custom Type B sleeve around an existing clamp, Florida
- Type B sleeves replacing mechanical clamps at a Texas refinery
- Double-hump girth-weld sleeve on a 26-inch Kentucky gas line
- Compression sleeve on a crude line, Middle East operator
Spotted an error? Engineers keep this site honest.Report an error or suggest a correction