07 · Case studies
Type A sleeve leak on Colonial Line 1, Huntersville, North Carolina (CPF 2-2021-005-NOPSO)
In short 2020 gasoline leak on Colonial Line 1 in Huntersville, NC, from corrosion fatigue under a 2004 Type A sleeve installed over a shallow dent.
Source: PHMSA, Office of Pipeline Safety, Southern Region (2020). Account type: Independent regulatory record.
On 14 August 2020, residents reported a gasoline leak near Huntersville, North Carolina, on Colonial Pipeline Line 1. The source was a Type A sleeve installed in 2004 over a shallow dent. Water was present under the sleeve, and laboratory work pointed to corrosion fatigue as the main way the crack grew through the wall. Colonial first put a Type B sleeve over the failed Type A repair and restarted the 40-inch X60 line, then later cut the section out for analysis. The reported spill volume was raised to 28,571 barrels. PHMSA’s March 2021 notice treated Type A sleeves as a system-wide integrity issue, not a one-off defect.
Method
Type A steel sleeve (failed in service), followed by a Type B pressure-containing sleeve installed over the Type A sleeve as a temporary repair, then a cut-out and pipe replacement for laboratory analysis.
Defect
Shallow dent originally reinforced by a Type A sleeve in 2004; a through-wall crack later developed in the anomaly. Metallurgical analysis identified corrosion fatigue as the primary crack-growth mechanism, with water present under the sleeve.
Pipe
Colonial Line 1: 40-inch, 0.312-inch wall, API 5L X60, DSAW seam, coal-tar coating, manufactured in 1978 by Bethlehem Steel. MOP 673 psig. Operating pressure at the estimated time of failure was 183 psig. Gasoline service.
Outcome
Colonial’s reported release volume was revised from 75 barrels to 6,490 barrels and then to 28,571 barrels (about 1.2 million gallons) of gasoline. The leak was in the Oehler Nature Preserve. After a temporary Type B oversleeve, the company cut out the failed section and sent it for independent metallurgical analysis. PHMSA proposed a system-wide Type A sleeve inventory and remediation program.
This account is taken from a public regulatory or investigative record.
Dates: Leak reported 14 August 2020. Temporary Type B oversleeve installed and the line restarted 19 August 2020. Failed pipe cut out 10 November 2020. Notice of Proposed Safety Order issued 29 March 2021.
Maker named in the source: Sleeve manufacturer not named.
Sources
- Type A sleeve leak on Colonial Line 1, Huntersville, North Carolina (CPF 2-2021-005-NOPSO) — PHMSA, Office of Pipeline Safety, Southern Region
Related notes
- Type A steel sleeves — Repair methods
- Advisory bulletins that bear on repair — Regulations and official guidance
- Dents — Defect assessment
- ASME B31.8 and B31.8S — Codes and standards
- Steel sleeves reinforcing corrosion and plain dents, 2021 — Test reports
- Choosing a repair — Repair methods
Also in Case studies
- Type A sleeve leak on the Twin Oaks Pipeline, Upper Makefield Township, Pennsylvania
- Type B sleeve leak on the Marysville-Toledo Crude Pipeline, Sterling Heights, Michigan (CAO 4-2026-025)
- Type A sleeve leak on Colonial Line, Gwinnett County (Harbins Road), Georgia
- Type A sleeve leak on the CNG/Plantation pipeline, Belton, South Carolina
- Type C compression-sleeve repairs on the Oasis Pipeline, Texas
- In-service X70 Type B sleeve installation on West-East Gas Pipeline Line 3, China
- Subsea Clamp+Sleeve repair of a buckled 10-inch crude line, South Marsh Island Block 59
- ROV-installed Flange Repair Split+Sleeve on a 10-inch water-injection line, offshore Angola
- ROV-installed leak-sealing clamp on a 10-inch water-injection riser flange, Foinaven field
- Emergency leak repair on a 30-inch onshore pipeline with a bolt-on fitting
- Composite sleeve repair of 900 feet of cooling-tower corrosion on a U.S. refinery pipeline
- Composite sleeve repair of a dent and seam-weld crack on a 24-inch crude-oil pipeline
- Underwater composite sleeve repair of girth-weld corrosion on a 12-inch gas pipeline
- Composite sleeve repair of a rockfall dent on a 36-inch hydroelectric pipeline in the French Alps
- Burst test of a composite sleeve repair recovered after 25 years in service (installed 1995)
- Composite pipe-wrap repairs of corrosion on Equistar Pipeline, Texas
- Weld-wrap composite reinforcement of an internal weld defect on a 24-inch products pipeline, Western Europe
- Composite repair of a 32-inch offshore riser, Thailand
- Splash-zone composite repair of mechanical damage on a 12-inch subsea crude line, Gulf of Mexico
- Carbon-fiber repair of a deep crack on a 900 mm gas-transmission bend
- Epoxy-filled sleeve encapsulation of a large dent on a 14-inch trunkline, Papua New Guinea
- High-pressure line-plug isolation to remove a stuck pig and replace a leaking valve on a CO2 pipeline
- Line-plug train isolation and diversion of two 24-inch gas transmission lines under a planned Singapore subway station
- Line-plug train isolation to decommission a gas-processing plant off a 36-inch transmission line, Alabama
- Emergency double line-plug isolation of a burning 14-inch NGL pipeline after a third-party strike, West Texas
- 12-inch double line-plug isolation with bypass for a live gas-line repair, Oklahoma
- Line stop to connect 8-inch PE gas mains, St. Louis
- Insertion valves and line stops after a sheared 8-inch valve, Covington, Ohio
- Epoxy recoating of HDD-damaged girth and spiral welds, Kansas
- West Virginia 30-inch leak at a previous composite wrap
- Port Allen valve-station dent reinforced with an E-glass wrap
- 14-inch diesel line at Redding, Pennsylvania, carbon wrap
- Hinged protective tools on a 24-inch Florida line during bridge work
- Custom Type B sleeve around an existing clamp, Florida
- Type B sleeves replacing mechanical clamps at a Texas refinery
- Double-hump girth-weld sleeve on a 26-inch Kentucky gas line
- Compression sleeve on a crude line, Middle East operator
Spotted an error? Engineers keep this site honest.Report an error or suggest a correction