14-inch diesel line at Redding, Pennsylvania, carbon wrap

In short A 41-foot carbon-fiber wrap on a shut-in 14-inch diesel line after an in-line inspection call of lack of fusion, dents, and wrinkle bends.

Updated . Sources are listed at the end. Markdown version.

Source: Allan Edwards field account, written by Allan Edwards (year of the December wrap is not stated).

The running text describes a 14-inch diesel line near a major roadway in Redding, Pennsylvania. The source filename identifies the job as a Buckeye job. That operator name is taken from the filename, not from a sentence in the account and not from an independent record.

In-line inspection had reported 42 percent lack of fusion at the long seam. Further inspection found dents and weld-joint and long-seam defects. Sandblasting then showed two additional wrinkle bends. The line stayed shut in until the repair was finished.

The repair was an OmegaWrap C (carbon) wet wrap of a 41-foot section, done under heating tents at about 20°F. Installer training was the day before the wrap. The account says the wrap itself ran from 11 a.m. to 10 p.m. on 21 December. It also says a quote was requested on 22 November and returned within 24 hours, that temporary approval came within three weeks, that a purchase order followed on 15 December, and that a field supervisor was on site 19 December. Those dates and the “within one month” claim are the publisher’s. The year is not in the text.

Sources

  1. Allan Edwards field account, 14-inch diesel line, Redding, Pennsylvania. The source filename identifies the job as Buckeye; the running text does not. — Allan Edwards